0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Hasan, Monjurul / Lu, Ming (2022): Variance Analysis on Regression Models for Estimating Labor Costs of Prefabricated Components. Dans: Journal of Computing in Civil Engineering, v. 36, n. 5 (septembre 2022).

    https://doi.org/10.1061/(asce)cp.1943-5487.0001037

  2. Nasiri, Sasan / Lu, Ming (2022): Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application. Dans: Automation in Construction, v. 133 (janvier 2022).

    https://doi.org/10.1016/j.autcon.2021.104002

  3. Liu, Jing / Lu, Ming (2020): Synchronized Optimization of Various Management-Function Schedules in a Multiproject Environment: Case Study of Planning Steel Girder Fabrication Projects in Bridge Construction. Dans: Journal of Construction Engineering and Management, v. 146, n. 5 (mai 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001813

  4. Lu, Ming / Li, Qiang / Ning, Zhi / Ji, Zhao (2018): Study on the aerodynamic load characteristic of noise reduction barrier on high-speed railway. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 176 (mai 2018).

    https://doi.org/10.1016/j.jweia.2018.03.031

  5. Lu, Ming / Xing, Jun / Chen, Yu (2015): The Study of Small Town Planning Based on S.E.T. Model-The West District of Suihua City, Heilongjiang Province, China as an Example. Dans: Civil Engineering and Architecture, v. 3, n. 4 (août 2015).

    https://doi.org/10.13189/cea.2015.030403

  6. Shi, Yumeng / Lu, Ming / Li, Weijian (2015): Study on Optimization of Architectural Shape Based on Wind Environment: A Study in Taiyuan, China. Dans: Civil Engineering and Architecture, v. 3, n. 5 (octobre 2015).

    https://doi.org/10.13189/cea.2015.030502

  7. Liu, Jing / Lu, Ming (2019): Robust Dual-Level Optimization Framework for Resource-Constrained Multiproject Scheduling for a Prefabrication Facility in Construction. Dans: Journal of Computing in Civil Engineering, v. 33, n. 2 (mars 2019).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000816

  8. Lu, Ming / AbouRizk, S. M. / Hermann, U. H. (2001): Sensitivity Analysis of Neural Networks in Spool Fabrication Productivity Studies. Dans: Journal of Computing in Civil Engineering, v. 15, n. 4 (octobre 2001).

    https://doi.org/10.1061/(asce)0887-3801(2001)15:4(299)

  9. Siu, Ming-Fung Francis / Lu, Ming / AbouRizk, Simaan (2016): Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints. Dans: Journal of Computing in Civil Engineering, v. 30, n. 2 (mars 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000498

  10. Lu, Ming / AbouRizk, S. M. (2000): Simplified CPM/PERT Simulation Model. Dans: Journal of Construction Engineering and Management, v. 126, n. 3 (mai 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:3(219)

  11. Bennett, F. Lawrence / Lu, Ming / AbouRizk, Simaan (2001): Simplified CPM/PERT Simulation Model. Dans: Journal of Construction Engineering and Management, v. 127, n. 6 (décembre 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:6(513)

  12. Lu, Ming / Lau, Sze-Chun / Poon, Chi-Sun (2009): Simulation Approach to Evaluating Cost Efficiency of Selective Demolition Practices: Case of Hong Kong's Kai Tak Airport Demolition. Dans: Journal of Construction Engineering and Management, v. 135, n. 6 (juin 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:6(448)

  13. Dai, Fei / Lu, Ming (2013): Three-Dimensional Modeling of Site Elements by Analytically Processing Image Data Contained in Site Photos. Dans: Journal of Construction Engineering and Management, v. 139, n. 7 (juillet 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000655

  14. Shen, Xuesong / Lu, Ming / Chen, Wu (2011): Tunnel-Boring Machine Positioning during Microtunneling Operations through Integrating Automated Data Collection with Real-Time Computing. Dans: Journal of Construction Engineering and Management, v. 137, n. 1 (janvier 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000250

  15. Li, Heng / Cao, Yang / Lu, Ming (2004): Semiautomated Detection of Design Errors in 2D Drawings Using 3D Reconstruction. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 19, n. 4 (juillet 2004).

    https://doi.org/10.1111/j.1467-8667.2004.00355.x

  16. Lu, Ming / Lam, Hoi-Ching / Dai, Fei (2008): Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization. Dans: Automation in Construction, v. 17, n. 6 (août 2008).

    https://doi.org/10.1016/j.autcon.2007.11.004

  17. Siu, Ming-Fung Francis / Lu, Ming / AbouRizk, Simaan / Tidder, Vincent (2016): Quantitative Assessment of Budget Sufficiency and Resource Utilization for Resource-Constrained Project Schedules. Dans: Journal of Construction Engineering and Management, v. 142, n. 6 (juin 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001106

  18. Lu, Ming (2003): Simplified Discrete-Event Simulation Approach for Construction Simulation. Dans: Journal of Construction Engineering and Management, v. 129, n. 5 (octobre 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:5(537)

  19. Lu, Ming / Li, Heng (2003): Resource-Activity Critical-Path Method for Construction Planning. Dans: Journal of Construction Engineering and Management, v. 129, n. 4 (août 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(412)

  20. Siu, Ming-Fung Francis / Lu, Ming / AbouRizk, Simaan (2016): Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001027

  21. Lu, Ming / Dai, Fei / Chen, Wu (2007): Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 8 (août 2007).

    https://doi.org/10.1139/l07-029

  22. Lu, Ming / Lam, Hoi-Ching (2009): Transform Schemes Applied on Non-Finish-to-Start Logical Relationships in Project Network Diagrams. Dans: Journal of Construction Engineering and Management, v. 135, n. 9 (septembre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000062

  23. Lee, Eun Hee / Christopoulos, George I. / Lu, Ming / Heo, Min Quan / Soh, Chee-Kiong (2016): Social aspects of working in underground spaces. Dans: Tunnelling and Underground Space Technology, v. 55 (mai 2016).

    https://doi.org/10.1016/j.tust.2015.12.012

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine