  1. Hasan, Monjurul / Lu, Ming (2024): Enhanced model tree for quantifying output variances due to random data sampling: Productivity prediction applications. Dans: Automation in Construction, v. 158 (février 2024).

    https://doi.org/10.1016/j.autcon.2023.105218

  2. Lu, Ming / Song, Di / Shi, Da / Liu, Jing / Wang, Lu (2022): Effect of High-Rise Residential Building Layout on the Spatial Vertical Wind Environment in Harbin, China. Dans: Buildings, v. 12, n. 6 (7 juin 2022).

    https://doi.org/10.3390/buildings12060705

  3. Mahdavian, Samin / Lu, Ming / Pereira, Estacio (2022): Application framework for safety-centric construction acceleration planning. Dans: Engineering, Construction and Architectural Management, v. 30, n. 4 (mars 2022).

    https://doi.org/10.1108/ecam-03-2021-0195

  4. Hasan, Monjurul / Lu, Ming (2021): Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction. Dans: Journal of Construction Engineering and Management, v. 147, n. 4 (avril 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002010

  5. Lu, Ming / Du, Jiangtao (2019): Dynamic evaluation of daylight availability in a highly-dense Chinese residential area with a cold climate. Dans: Energy and Buildings, v. 193 (juin 2019).

    https://doi.org/10.1016/j.enbuild.2019.03.045

  6. Wu, Bo / Lu, Ming / Huang, Wei / Lan, Yangbing / Wu, Yufang / Huang, Zonghui (2020): A Case Study on the Construction Optimization Decision Scheme of Urban Subway Tunnel Based on the TOPSIS Method. Dans: KSCE Journal of Civil Engineering, v. 24, n. 11 (septembre 2020).

    https://doi.org/10.1007/s12205-020-1290-9

  7. Lou, Wenjuan / Wang, Jiawei / Chen, Yong / Lv, Zhongbin / Lu, Ming (2016): Effect of motion path of downburst on wind-induced conductor swing in transmission line. Dans: Wind & Structures, v. 23, n. 3 (septembre 2016).

    https://doi.org/10.12989/was.2016.23.3.211

  8. Li, Duanshun / Lu, Ming (2019): Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 34, n. 4 (mars 2019).

    https://doi.org/10.1111/mice.12420

  9. Tang, S. L. / Lu, Ming / Chan, Y. L. (2003): Achieving Client Satisfaction for Engineering Consulting Firms. Dans: Journal of Management in Engineering (ASCE), v. 19, n. 4 (octobre 2003).

    https://doi.org/10.1061/(asce)0742-597x(2003)19:4(166)

  10. Lu, Ming / Du, Jiangtao (2013): Assessing the daylight and sunlight availability in high-density residential areas: a case in North-east China. Dans: Architectural Science Review, v. 56, n. 2 (mai 2013).

    https://doi.org/10.1080/00038628.2012.729311

  11. Lu, Ming / Zhang, Yan / Xing, Jun / Ma, Wenda (2018): Assessing the Solar Radiation Quantity of High-Rise Residential Areas in Typical Layout Patterns: A Case in North-East China. Dans: Buildings, v. 8, n. 11 (novembre 2018).

    https://doi.org/10.3390/buildings8110148

  12. Lu, Ming / AbouRizk, S. M. / Hermann, Ulrich H. (2000): Estimating Labor Productivity Using Probability Inference Neural Network. Dans: Journal of Computing in Civil Engineering, v. 14, n. 4 (octobre 2000).

    https://doi.org/10.1061/(asce)0887-3801(2000)14:4(241)

  13. Shen, Xuesong / Lu, Ming / Chen, Wu (2011): Computing Three-Axis Orientations of a Tunnel-Boring Machine through Surveying Observation Points. Dans: Journal of Computing in Civil Engineering, v. 25, n. 3 (mai 2011).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000087

  14. Dai, Fei / Lu, Ming / Kamat, Vineet R. (2011): Analytical Approach to Augmenting Site Photos with 3D Graphics of Underground Infrastructure in Construction Engineering Applications. Dans: Journal of Computing in Civil Engineering, v. 25, n. 1 (janvier 2011).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000072

  15. Wu, Xiaodong / Lu, Ming / Shen, Xuesong (2016): Computational Approach to As-Built Tunnel Invert Survey Based on Processing Real-Time TBM Tracking Data. Dans: Journal of Computing in Civil Engineering, v. 30, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000435

  16. Lu, Ming / Anson, Michael (2004): Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. Dans: Journal of Construction Engineering and Management, v. 130, n. 2 (avril 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:2(216)

  17. Liu, Jing / Lu, Ming (2018): Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. Dans: Journal of Construction Engineering and Management, v. 144, n. 7 (juillet 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001507

  18. Lu, Ming / Wong, Lap-Chi (2007): Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA. Dans: Automation in Construction, v. 16, n. 1 (janvier 2007).

    https://doi.org/10.1016/j.autcon.2005.12.001

  19. Huang, Ziping / Broch, Einar / Lu, Ming (2002): Cavern roof stability—mechanism of arching and stabilization by rockbolting. Dans: Tunnelling and Underground Space Technology, v. 17, n. 3 (juillet 2002).

    https://doi.org/10.1016/s0886-7798(02)00010-x

  20. Mao, Dawei / Nilsen, Bjørn / Lu, Ming (2011): Analysis of loading effects on reinforced shotcrete ribs caused by weakness zone containing swelling clay. Dans: Tunnelling and Underground Space Technology, v. 26, n. 3 (mai 2011).

    https://doi.org/10.1016/j.tust.2011.01.004

  21. Lau, Sze-Chun / Lu, Ming / Ariaratnam, Samuel T. (2010): Applying radial basis function neural networks to estimate next-cycle production rates in tunnelling construction. Dans: Tunnelling and Underground Space Technology, v. 25, n. 4 (juillet 2010).

    https://doi.org/10.1016/j.tust.2010.01.010

  22. Liu, Hexu / Al-Hussein, Mohamed / Lu, Ming (2015): BIM-based integrated approach for detailed construction scheduling under resource constraints. Dans: Automation in Construction, v. 53 (mai 2015).

    https://doi.org/10.1016/j.autcon.2015.03.008

  23. Lau, Sze-Chun / Lu, Ming / Poon, Chi-Sun (2014): Formalized Approach to Discretize a Continuous Plant in Construction Simulations. Dans: Journal of Construction Engineering and Management, v. 140, n. 8 (août 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000872

  24. Lu, Ming (2002): Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling. Dans: Journal of Construction Engineering and Management, v. 128, n. 5 (octobre 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:5(438)

  25. Dai, Fei / Lu, Ming (2010): Assessing the Accuracy of Applying Photogrammetry to Take Geometric Measurements on Building Products. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000114

  26. Lu, Ming / Shen, Xuesong / Chen, Wu (2009): Automated Collection of Mixer Truck Operations Data in Highly Dense Urban Areas. Dans: Journal of Construction Engineering and Management, v. 135, n. 1 (janvier 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:1(17)

  27. Lu, Ming / Poon, Chi-Sun / Wong, Lap-Chi (2006): Application Framework for Mapping and Simulation of Waste Handling Processes in Construction. Dans: Journal of Construction Engineering and Management, v. 132, n. 11 (novembre 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:11(1212)

  28. Li, Duanshun / Lu, Ming (2017): Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach. Dans: Journal of Construction Engineering and Management, v. 143, n. 1 (janvier 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001214

  29. Liu, Hexu / Singh, Gurjeet / Lu, Ming / Bouferguene, Ahmed / Al-Hussein, Mohamed (2018): BIM-based automated design and planning for boarding of light-frame residential buildings. Dans: Automation in Construction, v. 89 (mai 2018).

    https://doi.org/10.1016/j.autcon.2018.02.001

  30. Soleimanifar, Meimanat / Shen, Xuesong / Lu, Ming / Nikolaidis, Ioanis (2014): Applying received signal strength based methods for indoor positioning and tracking in construction applications. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 8 (août 2014).

    https://doi.org/10.1139/cjce-2013-0433

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine