Informations générales
Nom en langue locale: | 深中大桥 (Shēnzhōng Dàqiáo) |
---|---|
Début des travaux: | mai 2017 |
Achèvement: | 2024 |
Etat: | en construction |
Type de construction
Fonction / utilisation: |
Connexion routière |
---|
Situation de l'ouvrage
km | Nom |
Informations techniques
Dimensions
longueur totale | 51 km | |
nombre de voies routières | 2 x 4 |
Intervenants
Sites Internet pertinents
Publications pertinentes
- Key Construction Techniques of East Tower and Anchorage of Lingdingyang Bridge in Shenzhong Link. Présenté pendant: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, pp. 2066-2067. (2022):
- (2017): The Shenzhong Link – A synthesis of architectural and structural design. Présenté pendant: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, pp. 1375-1382.
- ShenZhong Passage (Island-Tunnel) Project – Refined Exploration Technology and Management. Dans: IOP Conference Series: Materials Science and Engineering, v. 741, n. 1 (1 janvier 2020), pp. 012049. (2020):
- Informations
sur cette fiche - Structure-ID
20085384 - Publié(e) le:
16.02.2023 - Modifié(e) le:
16.02.2023