0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Realization of Timber Vehicle Bridge in Korea

 Realization of Timber Vehicle Bridge in Korea
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020, publié dans , pp. 503-510
DOI: 10.2749/wroclaw.2020.0503
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.7 MB

The first timber bridge for vehicles in Korea, a single-span, arched truss bridge 30m in length, was constructed in 2012. The bridge was designed and constructed as a part of national research proj...
Lire plus

Détails bibliographiques

Auteur(s):





Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020
Publié dans:
Page(s): 503-510 Nombre total de pages (du PDF): 8
Page(s): 503-510
Nombre total de pages (du PDF): 8
Année: 2020
DOI: 10.2749/wroclaw.2020.0503
Abstrait:

The first timber bridge for vehicles in Korea, a single-span, arched truss bridge 30m in length, was constructed in 2012. The bridge was designed and constructed as a part of national research projects for the development large timber structures funded by the Korea Forest Research Institute. This paper introduces the development process of the timber structures in Korea as well as design, construction of the first vehicular timber bridge. In-situ truck load tests are performed along with multiple-year monitoring project for performance assessment. Both loading tests and long-term monitoring data show that the construction of the bridge agrees with initial baseline model and it still holds a sold soundness until 6 years after its birth.

Lieux géographiques