0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Optimization of the curved pylon

 Optimization of the curved pylon
Auteur(s):
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 2958-2965
DOI: 10.2749/vancouver.2017.2958
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.28 MB

Thu Thiem 2 Bridge is a new crossing to be built over the Saigon River in the city center of Ho Chi Minh City in Vietnam. It will be a landmark for a new urban Thu Thiem area and for the whole city...
Lire plus

Détails bibliographiques

Auteur(s): (WSP, Helsinki Finland)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 2958-2965 Nombre total de pages (du PDF): 8
Page(s): 2958-2965
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.2958
Abstrait:

Thu Thiem 2 Bridge is a new crossing to be built over the Saigon River in the city center of Ho Chi Minh City in Vietnam. It will be a landmark for a new urban Thu Thiem area and for the whole city. The cable-stayed bridge has a single, well recognizable, backwards curved pylon and asymmetric span arrangement with lengths of 200 and 115 meters (Figure 1).

In the engineering design phase, the structure shall be optimised, including minimization of quantities, whilst ensuring constructability and safety of the works. Normally, the minimization of quantities brings about financial savings, however in a challenging construction the ease of erection may also be the key for economical success.

This paper discusses the design of the complex structural concept of the Thu Thiem 2 Bridge, with particular attention to the design of the pylon. Optimization, in big and complex bridge projects, is a chain of choices based on designers' experiences as well as understanding of the local environment and construction culture. This is not often a measureable task.

Mots-clé:
design pont