0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Independent Design Checking of Brahmaputra Bridge, Guwahati - Sharing Experience & Lessons Learnt

 Independent Design Checking of Brahmaputra Bridge, Guwahati - Sharing Experience & Lessons Learnt
Auteur(s): ,
Présenté pendant IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, publié dans , pp. 156-163
DOI: 10.2749/newdelhi.2023.0156
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.99 MB

The new bridge over river Brahmaputra connecting Guwahati and North Guwahati is currently in the advanced stages of construction. Designed to be an iconic bridge with state-of-the-art aesthetic fea...
Lire plus

Détails bibliographiques

Auteur(s): (Managing Director, B&S Engineering Consultants Pvt. Ltd.)
(Senior Project Manager, B&S Engineering Consultants Pvt. Ltd.)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Publié dans:
Page(s): 156-163 Nombre total de pages (du PDF): 8
Page(s): 156-163
Nombre total de pages (du PDF): 8
DOI: 10.2749/newdelhi.2023.0156
Abstrait:

The new bridge over river Brahmaputra connecting Guwahati and North Guwahati is currently in the advanced stages of construction. Designed to be an iconic bridge with state-of-the-art aesthetic features, it is being built at a cost of INR 26 billion (USD 316 million). This mega project includes not only the river bridge over the mighty river Brahmaputra but also long elevated viaducts and approaches on both sides. The project is being executed in EPC mode. The paper brings to the fore the culture of proof checking generally performed in infrastructure projects in the country and describes the unique feature of IDC performed in this specific project. The author draws on his own experience as well as published information to illustrate the importance of establishing a culture of independent checking everywhere to add confidence and mitigate the risk of failures.

Mots-clé:
pont extradossé haubans