0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Important Parameters for Increased Productivity in Bridge Design and Production

 Important Parameters for Increased Productivity in Bridge Design and Production
Auteur(s): , , ORCID, ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 80-88
DOI: 10.2749/nanjing.2022.0080
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

There is great potential for increased productivity in the production of bridges in terms of optimizing material use, time and cost for design and production. Hence, the environmental impact and co...
Lire plus

Détails bibliographiques

Auteur(s): (Chalmers University of Technology, Swedish Transport Administration, Sweden)
(Chalmers University of Technology, Swedish Transport Administration, Sweden)
ORCID (Chalmers University of Technology, Sweden)
(Chalmers University of Technology, Sweden)
(Norwegian University of Science and Technology, Norway)
(Swedish Transport Administration, Sweden)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 80-88 Nombre total de pages (du PDF): 9
Page(s): 80-88
Nombre total de pages (du PDF): 9
DOI: 10.2749/nanjing.2022.0080
Abstrait:

There is great potential for increased productivity in the production of bridges in terms of optimizing material use, time and cost for design and production. Hence, the environmental impact and cost can be optimized. To find out how standardisation of parts of bridges and which parameters are of most importance for increased productivity in the production of bridges, a quantitate study was performed on the Swedish bridge construction industry. The questionnaire received 151 responses. The results show in which aspects and parameters the industry’s three major actors – engineers, contractors, and clients – see greatest potential in order to increase the productivity. By standardising parts in bridges, there is great potential in making the construction of bridges more productive.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.