0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Design and construction of the Second Hinterrhein-Bridge

 Design and construction of the Second Hinterrhein-Bridge
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 984-991
DOI: 10.2749/prague.2022.0984
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.14 MB

The Second Hinterrhein-Bridge is an award-winning new 200m long single-track railway bridge spanning over the river Rhine and the Highway A13 in a picturesque valley in the Swiss Alps. It has four ...
Lire plus

Détails bibliographiques

Auteur(s): (WaltGalmarini AG, Zurich, Switzerland)
(WaltGalmarini AG, Zurich, Switzerland)
(WaltGalmarini AG, Zurich, Switzerland)
(COWI UK Limited, London, United Kingdom)
(Dissing+Weitling, Copenhagen, Denmark)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 984-991 Nombre total de pages (du PDF): 8
Page(s): 984-991
Nombre total de pages (du PDF): 8
DOI: 10.2749/prague.2022.0984
Abstrait:

The Second Hinterrhein-Bridge is an award-winning new 200m long single-track railway bridge spanning over the river Rhine and the Highway A13 in a picturesque valley in the Swiss Alps. It has four spans and is located adjacent to a magnificent historic steel truss railway bridge. In the continuation of this heritage structure, a matching new 50m long bridge is spanning over the highway. The two bridges were carefully designed into a highly significant and sensitive location both from a transport infrastructure, landscape and heritage point of view. The girders have identical U-shaped cross sections formed by trapezoidal steel boxes on each side, with the tracks supported on ballast on top of a steel plate stiffened by shallow transverse crossbeams. The girders were fabricated in segments in the workshop and assembled on site into lifting segments up to 50m long that were installed by crawler crane. The last segment was lifted onto the new bridge and launched over the highway. On the completed bridge, load tests with two locomotives were carried out before taking the bridge into service. The design was the winner of an international competition held in 2015.

Mots-clé:
acier pont
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.