0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Demolition of Fatigued Bridges with Movable Scaffolding Systems

 Demolition of Fatigued Bridges with Movable Scaffolding Systems
Auteur(s):
Présenté pendant IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020, publié dans , pp. 414-421
DOI: 10.2749/wroclaw.2020.0414
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.81 MB

The central European highway-infrastructure of the 1960s and 1970s is characterized by increasing overstraining. Often, repair tasks only allow further usage for a limited amount of time. Deconstru...
Lire plus

Détails bibliographiques

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020
Publié dans:
Page(s): 414-421 Nombre total de pages (du PDF): 8
Page(s): 414-421
Nombre total de pages (du PDF): 8
Année: 2020
DOI: 10.2749/wroclaw.2020.0414
Abstrait:

The central European highway-infrastructure of the 1960s and 1970s is characterized by increasing overstraining. Often, repair tasks only allow further usage for a limited amount of time. Deconstruction and replacement, particularly in ecologically sensitive areas and ones with a high amount of intersections, call for a plannable demolition method, which ensures that the interruption of traffic on the affected route section is minimalized.

Mots-clé:
viaduc