0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Zhang, Xueqing / Akber, Muhammad Zeshan / Poon, C. S. / Zheng, Wei (2023): Predicting the 28-day compressive strength by mix proportions: Insights from a large number of observations of industrially produced concrete. Dans: Construction and Building Materials, v. 400 (octobre 2023).

    https://doi.org/10.1016/j.conbuildmat.2023.132754

  2. Zhang, Xueqing / Akber, Muhammad Zeshan / Zheng, Wei (2022): Predicting the slump of industrially produced concrete using machine learning: A multiclass classification approach. Dans: Journal of Building Engineering, v. 58 (octobre 2022).

    https://doi.org/10.1016/j.jobe.2022.104997

  3. Zhang, Xueqing / Ahmed, Rana Rabnawaz (2022): A queuing system for inert construction waste management on a reverse logistics network. Dans: Automation in Construction, v. 137 (mai 2022).

    https://doi.org/10.1016/j.autcon.2022.104221

  4. Zubair, Muhammad Umer / Zhang, Xueqing (2022): Investigation and Improvements of the Existing Best-Value Selection Criteria for Elevator Maintenance Contractors. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 1 (janvier 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0000987

  5. Zhang, Xueqing / Akber, Muhammad Zeshan / Zheng, Wei (2021): Prediction of seven-day compressive strength of field concrete. Dans: Construction and Building Materials, v. 305 (octobre 2021).

    https://doi.org/10.1016/j.conbuildmat.2021.124604

  6. Tariq, Salman / Zhang, Xueqing (2021): Socioeconomic, Macroeconomic, and Sociopolitical Issues in Water PPP Failures. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 5 (septembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000947

  7. Gao, Hui / Zhang, Xueqing (2013): A Markov-Based Road Maintenance Optimization Model Considering User Costs. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 28, n. 6 (mars 2013).

    https://doi.org/10.1111/mice.12009

  8. Zubair, Muhammad Umer / Zhang, Xueqing (2020): Hybrid Performance-Measurement Model of Elevators. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 2 (avril 2020).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001406

  9. Wu, Di / Zhang, Xueqing (2019): Improving As-built Records of Underground Utilities: Barriers and Solutions. Dans: International Journal of Architecture Engineering and Construction, v. 8, n. 2 (juin 2019).

    https://doi.org/10.7492/ijaec.2019.012

  10. Zhang, Xueqing / Xiong, Wei (2015): Renegotiation and Early-Termination in Public Private Partnerships. Dans: International Journal of Architecture Engineering and Construction, v. 4, n. 4 (décembre 2015).

    https://doi.org/10.7492/ijaec.2015.021

  11. Zhang, Xueqing / Soomro, Mohsin Ali (2016): Failure Path Analysis with Respect to Private Sector Partners in Transportation Public-Private Partnerships. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000384

  12. Soomro, Mohsin Ali / Zhang, Xueqing (2015): Roles of Private-Sector Partners in Transportation Public-Private Partnership Failures. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 4 (juillet 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000263

  13. Hu, Zhen / Chen, Shu / Zhang, Xueqing (2014): Value for money and its influential factors: an empirical study of PPP projects in Japan. Dans: Built Environment Project and Asset Management, v. 4, n. 2 (mai 2014).

    https://doi.org/10.1108/bepam-12-2012-0055

  14. Cheung, Moe M. S. / So, Kevin K. L. / Zhang, Xueqing (2012): Life cycle cost management of concrete structures relative to chloride-induced reinforcement corrosion. Dans: Structure and Infrastructure Engineering, v. 8, n. 12 (décembre 2012).

    https://doi.org/10.1080/15732479.2010.507474

  15. Zhang, Xueqing (2004): Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 130, n. 5 (octobre 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:5(670)

  16. Zhang, Xueqing (2005): Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 131, n. 6 (juin 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:6(656)

  17. Zhang, Xueqing (2009): Win–Win Concession Period Determination Methodology. Dans: Journal of Construction Engineering and Management, v. 135, n. 6 (juin 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000012

  18. Zhang, Xueqing (2005): Paving the Way for Public–Private Partnerships in Infrastructure Development. Dans: Journal of Construction Engineering and Management, v. 131, n. 1 (janvier 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:1(71)

  19. Zhang, Xueqing / Gao, Hui (2010): Optimal Performance-Based Building Facility Management. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 25, n. 4 (mai 2010).

    https://doi.org/10.1111/j.1467-8667.2009.00633.x

  20. Li, Yashuai / Zhang, Xueqing (2013): Web-based construction waste estimation system for building construction projects. Dans: Automation in Construction, v. 35 (novembre 2013).

    https://doi.org/10.1016/j.autcon.2013.05.002

  21. Zhang, Xueqing (2006): Public Clients' Best Value Perspectives of Public Private Partnerships in Infrastructure Development. Dans: Journal of Construction Engineering and Management, v. 132, n. 2 (février 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:2(107)

  22. Zhang, Xueqing (2006): Markov-Based Optimization Model for Building Facilities Management. Dans: Journal of Construction Engineering and Management, v. 132, n. 11 (novembre 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:11(1203)

  23. Xiong, Wei / Zhang, Xueqing (2016): The Real Option Value of Renegotiation in Public–Private Partnerships. Dans: Journal of Construction Engineering and Management, v. 142, n. 8 (août 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001130

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine