0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Wang, Shih-Hsu (2023): Engineering Consulting Project Budget Allocation and Cost Control Model Based on Baseline Productivity. Dans: KSCE Journal of Civil Engineering, v. 27, n. 6 (avril 2023).

    https://doi.org/10.1007/s12205-023-0131-z

  2. Wang, Shih-Hsu (2022): Engineering Productivity and Unit Price Assessment Model. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 1 (janvier 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0000983

  3. Yang, Li-Hsi / Xu, Liuya / Wang, Wei-Chih / Wang, Shih-Hsu (2020): Building Information Model and Optimization Algorithms for Supporting Campus Facility Maintenance Management: A Case Study of Maintaining Water Dispensers. Dans: KSCE Journal of Civil Engineering, v. 25, n. 1 (octobre 2020).

    https://doi.org/10.1007/s12205-020-0219-7

  4. Hsiao, Fan-Yi / Wang, Shih-Hsu / Wang, Wei-Chih / Wen, Chao-Pao / Yu, Wen-der (2012): Neuro-Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction. Neuro-fuzzy cost estimation model. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 27, n. 10 (octobre 2012).

    https://doi.org/10.1111/j.1467-8667.2012.00786.x

  5. Wang, Shih-Hsu / Wang, Wei-Chih / Hsu, Pei-Yuan / Chen, Ci-Hao / Wang, Kun-Chi (2016): Establishing Engineering S-curves To Evaluate Supervision Engineer Allocations for Highway Construction Projects. Dans: Journal of Civil Engineering and Management, v. 22, n. 7 (juillet 2016).

    https://doi.org/10.3846/13923730.2014.928363

  6. Wang, Wei-Chih / Lin, Chia-Li / Wang, Shih-Hsu / Liu, Jang-Jeng / Lee, Ming-Tsung (2014): Application of Importance-satisfaction Analysis and Influence-relations Map To Evaluate Design Delay Factors. Dans: Journal of Civil Engineering and Management, v. 20, n. 4 (juillet 2014).

    https://doi.org/10.3846/13923730.2013.801922

  7. Wang, Shih-Hsu / Wang, Wei-Chih / Wang, Kun-Chi / Shih, Shih-Yu (2015): Applying building information modeling to support fire safety management. Dans: Automation in Construction, v. 59 (novembre 2015).

    https://doi.org/10.1016/j.autcon.2015.02.001

  8. Wang, Wei-Chih / Weng, Shao-Wei / Wang, Shih-Hsu / Chen, Cheng-Yi (2014): Integrating building information models with construction process simulations for project scheduling support. Dans: Automation in Construction, v. 37 (janvier 2014).

    https://doi.org/10.1016/j.autcon.2013.10.009

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine