0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mirosław J. Skibniewski ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Khoso, Ali Raza / Yusof, Aminah Md. / Chen, Zhen-Song / Wang, Xian-Jia / Skibniewski, Mirosław J. / Memon, Nafees Ahmed (2021): Embedded Remote Group Environment Through Modification in Macbeth – an Application of Contractor’s Selection in Construction. Dans: Journal of Civil Engineering and Management, v. 27, n. 8 (8 novembre 2021).

    https://doi.org/10.3846/jcem.2021.15763

  2. Yuan, Jingfeng / Chan, Albert P. C. / Xia, Bo / Skibniewski, Mirosław J. / Xiong, Wei / Ji, Chuang (2016): Cumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study. Dans: Journal of Infrastructure Systems, v. 22, n. 2 (juin 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000272

  3. Zhang, Lei / Yuan, Jingfeng / Xia, Nini / Ning, Yan / Ma, Junwei / Skibniewski, Mirosław J. (2020): Measuring Value-Added-Oriented BIM Climate in Construction Projects: Dimensions and Indicators. Dans: Journal of Civil Engineering and Management, v. 26, n. 8 (5 novembre 2020).

    https://doi.org/10.3846/jcem.2020.13893

  4. Yuan, Jingfeng / Li, Wei / Zheng, Xiaodan / Skibniewski, Mirosław J. (2018): Improving Operation Performance of Public Rental Housing Delivery by PPPs in China. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 4 (juillet 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000615

  5. Zhang, Hong / Jin, Rui / Li, Heng / Skibniewski, Mirosław J. (2018): Pavement Maintenance–Focused Decision Analysis on Concession Periods of PPP Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 1 (janvier 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000568

  6. Yuan, Jingfeng / Xu, Wei / Xia, Bo / Skibniewski, Mirosław J. (2018): Exploring Key Indicators of Residual Value Risks in China’s Public–Private Partnership Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 1 (janvier 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000561

  7. Wei, Hsi-Hsien / Liu, Muqing / Skibniewski, Mirosław J. / Balali, Vahid (2016): Prioritizing Sustainable Transport Projects through Multicriteria Group Decision Making: Case Study of Tianjin Binhai New Area, China. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000449

  8. Yuan, Jingfeng / Chan, Albert P. C. / Xiong, Wei / Skibniewski, Mirosław J. / Li, Qiming (2015): Perception of Residual Value Risk in Public Private Partnership Projects: Critical Review. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 3 (mai 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000256

  9. Yuan, Jingfeng / Wang, Chao / Skibniewski, Mirosław J. / Li, Qiming (2012): Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000113

  10. Tatari, Omer / Castro-Lacouture, Daniel / Skibniewski, Mirosław J. (2008): Performance Evaluation of Construction Enterprise Resource Planning Systems. Dans: Journal of Management in Engineering (ASCE), v. 24, n. 4 (octobre 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:4(198)

  11. Xiong, Wei / Yuan, Jing-Feng / Li, Qiming / Skibniewski, Mirosław J. (2015): Performance Objective-based Dynamic Adjustment Model To Balance the Stakeholders’ Satisfaction in Ppp Projects. Dans: Journal of Civil Engineering and Management, v. 21, n. 5 (mai 2015).

    https://doi.org/10.3846/13923730.2014.895409

  12. Skibniewski, Mirosław J. (2014): Information Technology Applications in Construction Safety Assurance. Dans: Journal of Civil Engineering and Management, v. 20, n. 6 (décembre 2014).

    https://doi.org/10.3846/13923730.2014.987693

  13. Kačianauskas, Rimantas / Kaklauskas, Arturas / Skibniewski, Mirosław J. / Kaklauskas, Gintaris / Antuchevičienė, Jurgita / Tupenaite, Laura (2014): A Life Dedicated To Science. On the Occasion of the 70th Birthday of Editor-in-chief Edmundas Kazimieras Zavadskas. Dans: Journal of Civil Engineering and Management, v. 20, n. 3 (juin 2014).

    https://doi.org/10.3846/13923730.2014.925276

  14. Ren, Yali / Skibniewski, Mirosław J. / Jiang, Shaohua (2012): Building Information Modeling Integrated With Electronic Commerce Material Procurement and Supplier Performance Management System. Dans: Journal of Civil Engineering and Management, v. 18, n. 5 (septembre 2012).

    https://doi.org/10.3846/13923730.2012.719835

  15. Ghosh, Saumyendu / Amaya, Lenis / Skibniewski, Mirosław J. (2012): Identifying Areas of Knowledge Governance for Successful Projects. Dans: Journal of Civil Engineering and Management, v. 18, n. 4 (septembre 2012).

    https://doi.org/10.3846/13923730.2012.700642

  16. Yuan, Jing-Feng / Skibniewski, Mirosław J. / Li, Qiming / Shan, Jin (2010): The Driving Factors of China's Public-Private Partnership Projects in Metropolitian Transportation Systems: Public Sector's Viewpoint. Dans: Journal of Civil Engineering and Management, v. 16, n. 1 (mars 2010).

    https://doi.org/10.3846/jcem.2010.01

  17. Tatari, Omer / Castro‐Lacouture, Daniel / Skibniewski, Mirosław J. (2007): Current state of construction enterprise information systems: survey research. Dans: Construction Innovation, v. 7, n. 4 (octobre 2007).

    https://doi.org/10.1108/14714170710780075

  18. Shohet, Igal M. / Wei, Hsi-Hsien / Skibniewski, Mirosław J. / Tak, Bhanu / Revivi, Matty (2019): Integrated Communication, Control, and Command of Construction Safety and Quality. Dans: Journal of Construction Engineering and Management, v. 145, n. 9 (septembre 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001679

  19. Yu, Wen-der / Skibniewski, Mirosław J. (2010): Integrating Neurofuzzy System with Conceptual Cost Estimation to Discover Cost-Related Knowledge from Residential Construction Projects. Dans: Journal of Computing in Civil Engineering, v. 24, n. 1 (janvier 2010).

    https://doi.org/10.1061/(asce)0887-3801(2010)24:1(35)

  20. Castro-Lacouture, Daniel / Skibniewski, Mirosław J. (2006): Implementing a B2B e-Work System to the Approval Process of Rebar Design and Estimation. Dans: Journal of Computing in Civil Engineering, v. 20, n. 1 (janvier 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:1(28)

  21. Chung, Boo Young / Skibniewski, Mirosław J. / Lucas, Henry C. / Kwak, Young Hoon (2008): Analyzing Enterprise Resource Planning System Implementation Success Factors in the Engineering–Construction Industry. Dans: Journal of Computing in Civil Engineering, v. 22, n. 6 (novembre 2008).

    https://doi.org/10.1061/(asce)0887-3801(2008)22:6(373)

  22. Jang, Won-Suk / Skibniewski, Mirosław J. (2009): Embedded System for Construction Asset Tracking Combining Radio and Ultrasound Signals. Dans: Journal of Computing in Civil Engineering, v. 23, n. 4 (juillet 2009).

    https://doi.org/10.1061/(asce)0887-3801(2009)23:4(221)

  23. Chung, BooYoung / Skibniewski, Mirosław J. / Kwak, Young Hoon (2009): Developing ERP Systems Success Model for the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 135, n. 3 (mars 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:3(207)

  24. Hiremath, Harish R. / Skibniewski, Mirosław J. (2004): Object-oriented modeling of construction processes by unified modeling language. Dans: Automation in Construction, v. 13, n. 4 (juillet 2004).

    https://doi.org/10.1016/j.autcon.2003.09.011

  25. Tserng, H. Ping / Yin, Samuel Y. L. / Skibniewski, Mirosław J. / Lee, M. H. (2010): Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000125

  26. Skibniewski, Mirosław J. / Ghosh, Saumyendu (2009): Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms. Dans: Journal of Construction Engineering and Management, v. 135, n. 10 (octobre 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:10(965)

  27. Jang, Won-Suk / Skibniewski, Mirosław J. (2009): Cost-Benefit Analysis of Embedded Sensor System for Construction Materials Tracking. Dans: Journal of Construction Engineering and Management, v. 135, n. 5 (mai 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:5(378)

  28. Salman, Ahmed F. M. / Skibniewski, Mirosław J. / Basha, Ismail (2007): BOT Viability Model for Large-Scale Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 133, n. 1 (janvier 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:1(50)

  29. Wei, Hsi-Hsien / Shohet, Igal M. / Skibniewski, Mirosław J. / Shapira, Stav / Yao, Xijun (2016): Assessing the Lifecycle Sustainability Costs and Benefits of Seismic Mitigation Designs for Buildings. Dans: Journal of Architectural Engineering (ASCE), v. 22, n. 1 (mars 2016).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000188

  30. Wei, Hsi-Hsien / Skibniewski, Mirosław J. / Shohet, Igal M. / Yao, Xijun (2016): Lifecycle Environmental Performance of Natural-Hazard Mitigation for Buildings. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (juin 2016).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000803

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine