0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ren, Z. / Shen, G. Q. / Xue, X. L. / Hu, W. F. (2011): Lessons Learned from Principled Negotiation in International Construction Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 3, n. 3 (août 2011).

    https://doi.org/10.1061/(asce)la.1943-4170.0000055

  2. Ren, Z. / Anumba, G. J. / Ugwu, O. O. (2001): Construction claims management: towards an agent‐based approach. Dans: Engineering, Construction and Architectural Management, v. 8, n. 3 (mars 2001).

    https://doi.org/10.1108/eb021181

  3. Ren, Z. / Wang, X. / Chen, D. / Wang, C. / Thatcher, M. (2013): Constructing weather data for building simulation considering urban heat island. Dans: Building Services Engineering Research and Technology, v. 35, n. 1 (décembre 2013).

    https://doi.org/10.1177/0143624412467194

  4. Ren, Z. / Shen, G. Q. / Xue, X. L. (2013): Failure Caused by Inappropriate Construction Methods: An Expensive Lesson. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 1 (janvier 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000117

  5. Ren, Z. / Kwaw, P. / Yang, F. (2012): Ghana's public procurement reform and the continuous use of the traditional procurement system. The way forward. Dans: Built Environment Project and Asset Management, v. 2, n. 1 (juillet 2012).

    https://doi.org/10.1108/20441241211235053

  6. Ren, Z. / Hassan, T. M. (2007): Legal Requirements and Challenges for e-Business within the Single Electronic European Market. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 3 (juillet 2007).

    https://doi.org/10.1061/(asce)1052-3928(2007)133:3(246)

  7. Glodež, S. / Ren, Z. / Flašker, J. (1999): Surface fatigue of gear teeth flanks. Dans: Computers & Structures, v. 73, n. 1-5 (octobre 1999).

    https://doi.org/10.1016/s0045-7949(98)00251-x

  8. Ren, Z. / Glodež, S. (2002): Computational service life estimation of contacting mechanical elements in regard to pitting. Dans: Computers & Structures, v. 80, n. 27-30 (novembre 2002).

    https://doi.org/10.1016/s0045-7949(02)00263-8

  9. Ren, Z. / Anumba, C. J. / Ugwu, O. O. (2003): Multiagent System for Construction Claims Negotiation. Dans: Journal of Computing in Civil Engineering, v. 17, n. 3 (juillet 2003).

    https://doi.org/10.1061/(asce)0887-3801(2003)17:3(180)

  10. Ren, Z. / Anumba, C. J. (2004): Multi-agent systems in construction–state of the art and prospects. Dans: Automation in Construction, v. 13, n. 3 (mai 2004).

    https://doi.org/10.1016/j.autcon.2003.12.002

  11. Ren, Z. / Anumba, C. J. / Yang, F. (2013): Development of CDPM matrix for the measurement of collaborative design performance in construction. Dans: Automation in Construction, v. 32 (juillet 2013).

    https://doi.org/10.1016/j.autcon.2012.11.019

  12. Ren, Z. / Yang, F. / Bouchlaghem, N. M. / Anumba, C. J. (2011): Multi-disciplinary collaborative building design—A comparative study between multi-agent systems and multi-disciplinary optimisation approaches. Dans: Automation in Construction, v. 20, n. 5 (août 2011).

    https://doi.org/10.1016/j.autcon.2010.11.020

  13. Ren, Z. / Anumba, C. J. / Augenbroe, G. / Hassan, T. M. (2008): A functional architecture for an e-Engineering hub. Dans: Automation in Construction, v. 17, n. 8 (novembre 2008).

    https://doi.org/10.1016/j.autcon.2008.03.003

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine