0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Won, Jongbin / Park, Jong-Woong / Shim, Changsu / Park, Man-Woo (2021): Bridge-surface panoramic-image generation for automated bridge-inspection using deepmatching. Dans: Structural Health Monitoring, v. 20, n. 4 (avril 2021).

    https://doi.org/10.1177/1475921720930380

  2. Won, Daeyoun / Chi, Seokho / Park, Man-Woo (2020): UAV-RFID Integration for Construction Resource Localization. Dans: KSCE Journal of Civil Engineering, v. 24, n. 6 (avril 2020).

    https://doi.org/10.1007/s12205-020-2074-y

  3. Chung, Kyung-Soo / Jeon, Bae-Ho / Park, Man-Woo / Do, Byung-Ho (2012): 밀착조임 볼트체결에 따른 판폭두께비가 큰 변단면 프레임의 구조성능에 관한 실험적 연구 (Experimental Study on Structural Behavior of Tapered non-compact Frame with Snug-tightened Conditions). Dans: Journal of Korean Society of Steel Construction (한국강구조학회 논문집), v. 24, n. 3 (juin 2012).

    https://doi.org/10.7781/kjoss.2012.24.3.257

  4. Park, Man-Woo / Koch, Christian / Brilakis, Ioannis (2012): Three-Dimensional Tracking of Construction Resources Using an On-Site Camera System. Dans: Journal of Computing in Civil Engineering, v. 26, n. 4 (juillet 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000168

  5. Hui, Linda / Park, Man-Woo / Brilakis, Ioannis (2015): Automated Brick Counting for Façade Construction Progress Estimation. Dans: Journal of Computing in Civil Engineering, v. 29, n. 6 (novembre 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000423

  6. Park, Man-Woo / Elsafty, Nehad / Zhu, Zhenhua (2015): Hardhat-Wearing Detection for Enhancing On-Site Safety of Construction Workers. Dans: Journal of Construction Engineering and Management, v. 141, n. 9 (septembre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000974

  7. Park, Man-Woo / Makhmalbaf, Atefe / Brilakis, Ioannis (2011): Comparative study of vision tracking methods for tracking of construction site resources. Dans: Automation in Construction, v. 20, n. 7 (novembre 2011).

    https://doi.org/10.1016/j.autcon.2011.03.007

  8. Park, Man-Woo / Brilakis, Ioannis (2016): Continuous localization of construction workers via integration of detection and tracking. Dans: Automation in Construction, v. 72 (décembre 2016).

    https://doi.org/10.1016/j.autcon.2016.08.039

  9. Zhu, Zhenhua / Park, Man-Woo / Koch, Christian / Soltani, Mohamad / Hammad, Amin / Davari, Khashayar (2016): Predicting movements of onsite workers and mobile equipment for enhancing construction site safety. Dans: Automation in Construction, v. 68 (août 2016).

    https://doi.org/10.1016/j.autcon.2016.04.009

  10. Park, Man-Woo / Brilakis, Ioannis (2012): Construction worker detection in video frames for initializing vision trackers. Dans: Automation in Construction, v. 28 (décembre 2012).

    https://doi.org/10.1016/j.autcon.2012.06.001

  11. Dai, Fei / Park, Man-Woo / Sandidge, Matthew / Brilakis, Ioannis (2015): A vision-based method for on-road truck height measurement in proactive prevention of collision with overpasses and tunnels. Dans: Automation in Construction, v. 50 (février 2015).

    https://doi.org/10.1016/j.autcon.2014.10.005

  12. Lee, Yong-Ju / Park, Man-Woo (2019): 3D tracking of multiple onsite workers based on stereo vision. Dans: Automation in Construction, v. 98 (février 2019).

    https://doi.org/10.1016/j.autcon.2018.11.017

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine