0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Mohammed Abdelkader, Eslam / Moselhi, Osama / Marzouk, Mohamed / Zayed, Tarek (2020): Hybrid Elman Neural Network and an Invasive Weed Optimization Method for Bridge Defect Recognition. Dans: Transportation Research Record: Journal of the Transportation Research Board, v. 2675, n. 3 (15 décembre 2020).

    https://doi.org/10.1177/0361198120967943

  2. Omar, Abdelhady / Moselhi, Osama (2022): Hybrid feature selection framework for predicting bridge deck conditions. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022).

    https://doi.org/10.36680/j.itcon.2022.050

  3. Bardareh, Hassan / Moselhi, Osama (2022): An integrated RFID–UWB method for indoor localization of materials in construction. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022).

    https://doi.org/10.36680/j.itcon.2022.032

  4. Mohammed, Azhar / Kaddoura, Khalid / Zayed, Tarek / Moselhi, Osama / Hawari, Alaa (2022): Integrated Reliability Assessment Model for Drinking Water Networks: A Case Study of the City of London, Canada. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 36, n. 5 (octobre 2022).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001747

  5. Mohammed Abdelkader, Eslam / Moselhi, Osama / Marzouk, Mohamed / Zayed, Tarek (2022): An exponential chaotic differential evolution algorithm for optimizing bridge maintenance plans. Dans: Automation in Construction, v. 134 (février 2022).

    https://doi.org/10.1016/j.autcon.2021.104107

  6. Khan, Zafar / Moselhi, Osama / Zayed, Tarek (2015): Identifying Rehabilitation Options for Optimum Improvement in Municipal Asset Condition. Dans: Journal of Infrastructure Systems, v. 21, n. 2 (juin 2015).

    https://doi.org/10.1061/(asce)is.1943-555x.0000220

  7. Hegazy, Tarek / Moselhi, Osama (1994): Estimator: a prototype of an integrated bid preparation system. Dans: Engineering, Construction and Architectural Management, v. 1, n. 1 (janvier 1994).

    https://doi.org/10.1108/eb020992

  8. Moselhi, Osama / Alkass, Sabah / Al‐Hussein, Mohamed (2004): Innovative 3D‐modelling for selecting and locating mobile cranes. Dans: Engineering, Construction and Architectural Management, v. 11, n. 5 (octobre 2004).

    https://doi.org/10.1108/09699980410558575

  9. El‐Omari, Samir / Moselhi, Osama (2009): Data acquisition from construction sites for tracking purposes. Dans: Engineering, Construction and Architectural Management, v. 16, n. 5 (septembre 2009).

    https://doi.org/10.1108/09699980910988384

  10. Valinejadshoubi, Mojtaba / Moselhi, Osama / Bagchi, Ashutosh / Salem, Ashraf (2021): Development of an IoT and BIM-based automated alert system for thermal comfort monitoring in buildings. Dans: Sustainable Cities and Society, v. 66 (mars 2021).

    https://doi.org/10.1016/j.scs.2020.102602

  11. Mohammed Abdelkader, Eslam / Moselhi, Osama / Marzouk, Mohamed / Zayed, Tarek (2021): Entropy-Based Automated Method for Detection and Assessment of Spalling Severities in Reinforced Concrete Bridges. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 35, n. 1 (février 2021).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001544

  12. Moayeri, Valeh / Moselhi, Osama / Zhu, Zhenhua (2017): Design Change Management Using BIM-based Visualization Model. Dans: International Journal of Architecture Engineering and Construction, v. 6, n. 1 (mars 2017).

    https://doi.org/10.7492/ijaec.2017.001

  13. Valinejadshoubi, Mojtaba / Bagchi, Ashutosh / Moselhi, Osama (2020): Identifying At-Risk Non-Structural Elements in Buildings Using BIM: A Case Study Application. Dans: Journal of Earthquake Engineering, v. 24, n. 5 ( 2020).

    https://doi.org/10.1080/13632469.2018.1453407

  14. Hussein, Bahaa / Moselhi, Osama (2019): An Evolutionary Stochastic Discrete Time-cost Trade-off Method. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 7 (juillet 2019).

    https://doi.org/10.1139/cjce-2018-0352

  15. Valinejadshoubi, Mojtaba / Bagchi, Ashutosh / Moselhi, Osama (2019): Development of a BIM-Based Data Management System for Structural Health Monitoring with Application to Modular Buildings: Case Study. Dans: Journal of Computing in Civil Engineering, v. 33, n. 3 (mai 2019).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000826

  16. Moselhi, Osama / Nicholas, Matthew J. (1990): Hybrid Expert System for Construction Planning and Scheduling. Dans: Journal of Construction Engineering and Management, v. 116, n. 2 (juin 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:2(221)

  17. Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1993): DBID: Analogy‐Based DSS for Bidding in Construction. Dans: Journal of Construction Engineering and Management, v. 119, n. 3 (septembre 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:3(466)

  18. El-Rayes, Khaled / Moselhi, Osama (2001): Impact of Rainfall on the Productivity of Highway Construction. Dans: Journal of Construction Engineering and Management, v. 127, n. 2 (avril 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:2(125)

  19. El-Omari, Samir / Moselhi, Osama (2008): Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Dans: Automation in Construction, v. 18, n. 1 (décembre 2008).

    https://doi.org/10.1016/j.autcon.2008.05.006

  20. Razavi, Saiedeh N. / Moselhi, Osama (2012): GPS-less indoor construction location sensing. Dans: Automation in Construction, v. 28 (décembre 2012).

    https://doi.org/10.1016/j.autcon.2012.05.015

  21. Alzraiee, Hani / Zayed, Tarek / Moselhi, Osama (2015): Dynamic planning of construction activities using hybrid simulation. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.08.011

  22. Ibrahim, Magdy / Moselhi, Osama (2016): Inertial measurement unit based indoor localization for construction applications. Dans: Automation in Construction, v. 71 (novembre 2016).

    https://doi.org/10.1016/j.autcon.2016.05.006

  23. Ammar, Mohammad / Zayed, Tarek / Moselhi, Osama (2013): Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity. Dans: Journal of Construction Engineering and Management, v. 139, n. 5 (mai 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000576

  24. Marzouk, Mohamed / Moselhi, Osama (2004): Fuzzy Clustering Model for Estimating Haulers' Travel Time. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:6(878)

  25. Ammar, Mohammad A. / Moselhi, Osama / Zayed, Tarek M. (2012): Decision support model for selection of rehabilitation methods of water mains. Dans: Structure and Infrastructure Engineering, v. 8, n. 9 (septembre 2012).

    https://doi.org/10.1080/15732479.2010.497539

  26. Shehab-Eldeen, Tariq / Moselhi, Osama (2001): A decision support system for rehabilitation of sewer pipes. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 3 (juin 2001).

    https://doi.org/10.1139/l01-006

  27. Moselhi, Osama / Leonard, Charles / Fazio, Paul (1991): Impact of change orders on construction productivity. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 18, n. 3 (juin 1991).

    https://doi.org/10.1139/l91-059

  28. Montaser, Ali / Bakry, Ibrahim / Alshibani, Adel / Moselhi, Osama (2012): Estimating productivity of earthmoving operations using spatial technologies. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (septembre 2012).

    https://doi.org/10.1139/l2012-059

  29. Fahmy, Mohamed / Moselhi, Osama (2009): Forecasting the Remaining Useful Life of Cast Iron Water Mains. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 4 (août 2009).

    https://doi.org/10.1061/(asce)0887-3828(2009)23:4(269)

  30. Alshibani, Adel / Moselhi, Osama (2012): Fleet selection for earthmoving projects using optimization-based simulation. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 6 (juin 2012).

    https://doi.org/10.1139/l2012-042

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine