0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Quan, Junlong / Lee, Seok-Jung / Choi, Hye-Mi / Kim, Kyung-Hwan / Kim, Ju-Hyung (2016): LCCA 및 LCA 분석을 이용한 오피스 빌딩에 지능형 대기전력 제어시스템 도입의 타당성 분석에 관한 연구 (A Study of LCCA and LCA to Evaluate Feasibility for Introducing Smart Quiescent Power Control System into Office Building). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 2 (avril 2016).

    https://doi.org/10.5345/jkibc.2016.16.2.141

  2. Choi, Soo-Ho / Choi, Hyun-chul / Choi, Hye-Mi / Kim, Ju-Hyung (2014): 건설프로젝트에서 전략적 하도급 방안에 관한연구 : 설계시공병행방식 사례를 중심으로 (Research on the Strategy for Outsourcing in Construction Projects: in Fast-track Project). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 6 (décembre 2014).

    https://doi.org/10.5345/jkibc.2014.14.6.551

  3. Seo, Jung-Ho / Lee, Baek-Rae / Kim, Ju-Hyung / Kim, Jae-Jun (2012): Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 3 (juin 2012).

    https://doi.org/10.5345/jkibc.2012.12.3.299

  4. Jang, Jae-Ho / Hong, Rong-Lu / Lee, Kyung-Tae / Kim, Ju-Hyung (2023): A Comprehensive Approach to Capturing the Impact and Identifying Countermeasures of the COVID-19 Pandemic at Construction Sites in the Republic of Korea. Dans: Buildings, v. 14, n. 1 (31 décembre 2023).

    https://doi.org/10.3390/buildings14010030

  5. Lee, Kyung-Tae / Im, Jin-Bin / Park, Sang-Jun / Kim, Ju-Hyung: Identifying improvements priorities in daycare centre space performance from teachers' perspectives: application of importance–performance analysis and structural equation modelling. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-08-2022-0777

  6. Huh, Seung-Ha / Ham, Namhyuk / Kim, Ju-Hyung / Kim, Jae-Jun (2023): Quantitative impact analysis of priority policy applied to BIM-based design validation. Dans: Automation in Construction, v. 154 (octobre 2023).

    https://doi.org/10.1016/j.autcon.2023.105031

  7. Lee, Kyung-Tae / Park, Chang-Han / Kim, Ju-Hyung (2023): Examination of User Emotions and Task Performance in Indoor Space Design Using Mixed-Reality. Dans: Buildings, v. 13, n. 6 (23 mai 2023).

    https://doi.org/10.3390/buildings13061483

  8. Lee, Kyung-Tae / Ahn, Hannah / Kim, Ju-Hyung (2023): Project Coordinators’ Perceptions according to the Organization Structure to Reduce Communication Risks in Multinational Project. Dans: KSCE Journal of Civil Engineering, v. 27, n. 3 (7 janvier 2023).

    https://doi.org/10.1007/s12205-023-0862-x

  9. Kim, Hee-Jeong / Kim, Ju-Hyung / Im, Jin-Bin (2023): Forecasting Offline Retail Sales in the COVID-19 Pandemic Period: A Case Study of a Complex Shopping Mall in South Korea. Dans: Buildings, v. 13, n. 3 (26 février 2023).

    https://doi.org/10.3390/buildings13030627

  10. Lee, Kyung-Tae / Jekal, Jae-Woong / Kim, Ju-Hyung (2023): Client Briefing for Introducing Value Management to Establish Daycare Center Guidelines for the Republic of Korea. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 3 (mai 2023).

    https://doi.org/10.1061/jmenea.meeng-5090

  11. Kwon, Tae-Whan / Lee, Kyung-Tae / Kim, Ju-Hyung / Kim, Jae-Jun (2023): Proposal of Hierarchical Organization Structure for Negotiation Consensus in Multinational Joint-Client Megaprojects: Case of US Force Relocation Program in Korea. Dans: Journal of Construction Engineering and Management, v. 149, n. 2 (février 2023).

    https://doi.org/10.1061/jcemd4.coeng-12567

  12. Lee, Kyung-Tae / Park, Sang-Jun / Kim, Ju-Hyung (2022): Comparative analysis of managers’ perception in overseas construction project risks and cost overrun in actual cases: a perspective of the Republic of Korea. Dans: Journal of Asian Architecture and Building Engineering, v. 22, n. 4 (décembre 2022).

    https://doi.org/10.1080/13467581.2022.2116940

  13. Lee, Kyung-Tae / Im, Jin-Bin / Park, Sang-Jun / Kim, Ju-Hyung (2022): Conceptual Framework to Support Personalized Indoor Space Design Decision-Making: A Systematic Literature Review. Dans: Buildings, v. 12, n. 6 (7 juin 2022).

    https://doi.org/10.3390/buildings12060716

  14. Biabani, Fatemeh / Kim, Ju-Hyung / Ham, Namhyuk (2022): Qualitative Assessment of Collaborative Behavior Based on Self-Perception Personality Tests for BIM Staff. Dans: Buildings, v. 12, n. 4 (11 avril 2022).

    https://doi.org/10.3390/buildings12040426

  15. Lee, Kyung-Tae / Lee, Ju-Mi / Kim, Ju-Hyung (2021): Guidelines to Support Negotiation for Sustainable International Development Based on Hierarchical Roles and Responsibilities of Project-Based Organizations. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 5 (septembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000945

  16. Moon, Sungkon / Ham, Namhyuk / Kim, Sungjin / Hou, Lei / Kim, Ju-Hyung / Kim, Jae-Jun (2020): Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Dans: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).

    https://doi.org/10.1108/ecam-07-2018-0312

  17. Ham, Namhyuk / Moon, Sungkon / Kim, Ju-Hyung / Kim, Jae-Jun (2020): Optimal BIM staffing in construction projects using a queueing model. Dans: Automation in Construction, v. 113 (mai 2020).

    https://doi.org/10.1016/j.autcon.2020.103123

  18. Xuan, Meiyu / Yazdanpanah, Sara / Kim, Ju-Hyung (2020): Public Rental Housing Ownership Conversion Based on Housing Affordability in China. Dans: Journal of Asian Architecture and Building Engineering, v. 19, n. 3 (avril 2020).

    https://doi.org/10.1080/13467581.2020.1722675

  19. Sang, Jun / Ham, Nam-hyuk / Kim, Ju-Hyung / Kim, Jae-Jun (2014): Impacts of Macroeconomic Fluctuations on Insolvency: Case of Korean Construction Companies. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 5 (septembre 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000235

  20. Kim, Ju-Hyung / Choi, Hyeon-Jeong / Shin, Kyoochul (2015): Clients of Architectural Services and Online Communities: Exploration and Facilitation of Information Streams in the Korean Context. Dans: Journal of Asian Architecture and Building Engineering, v. 14, n. 1 (janvier 2015).

    https://doi.org/10.3130/jaabe.14.41

  21. Park, Jung-Lo / Yoo, Seung-Kyu / Lee, Jung-Seok / Kim, Ju-Hyung / Kim, Jae-Jun (2015): Comparing the Efficiency and Productivity of Construction Firms in China, Japan, and Korea Using DEA and DEA-based Malmquist. Dans: Journal of Asian Architecture and Building Engineering, v. 14, n. 1 (janvier 2015).

    https://doi.org/10.3130/jaabe.14.57

  22. Lee, Sanghyo / Shin, Kyoochul / Kim, Ju-Hyung / Kim, Jae-Jun (2014): Comparison of Dynamics in the Korean Housing Market Based on the FDW Model for the Periods Before and After the Macroeconomic Fluctuations. Dans: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (janvier 2014).

    https://doi.org/10.3130/jaabe.13.117

  23. Kwahk, Kil-Jong / Park, Min-Ho / Kim, Ju-Hyung / Kim, Jae-Jun (2011): Development of a Progress Management System Integrated with the Quality Inspection Process: Case of a nuclear power plant construction project in Korea. Dans: Journal of Asian Architecture and Building Engineering, v. 10, n. 2 (novembre 2011).

    https://doi.org/10.3130/jaabe.10.391

  24. Kim, Ju-Hyung / Yoon, Ja-Young / Kim, Kyung-Hwan / Kim, Jae-Jun (2009): A Conceptual Model of Intelligent Program Management Information Systems (iPMIS) for Urban Renewal Mega Projects in Korea. Dans: Journal of Asian Architecture and Building Engineering, v. 8, n. 1 (mai 2009).

    https://doi.org/10.3130/jaabe.8.57

  25. Choi, Jae-Kyu / Yoo, Seung-Kyu / Kim, Ju-Hyung / Kim, Jae-Jun (2014): Capital Structure Determinants among Construction Companies in South Korea: A Quantile Regression Approach. Dans: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (janvier 2014).

    https://doi.org/10.3130/jaabe.13.93

  26. Choi, Hyemi / Park, Min-Ho / Jeong, Dae-Min / Kim, Ju-Hyung (2017): Soil Recycling Among Construction Sites by Optimizing Schedule and Costs for Earthmoving. Dans: Journal of Asian Architecture and Building Engineering, v. 16, n. 2 (mai 2017).

    https://doi.org/10.3130/jaabe.16.439

  27. Kim, Jae-Jun / Kim, Ju-Hyung (1998): Designing bar-mesh modules of reinforced concrete structures. Dans: Computers & Structures, v. 67, n. 5 (juin 1998).

    https://doi.org/10.1016/s0045-7949(97)00141-7

  28. Ham, Namhyuk / Moon, Sungkon / Kim, Ju-Hyung / Kim, Jae-Jun (2018): Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001498

  29. Yang, Yong-Cheol / Park, Chan-Jung / Kim, Ju-Hyung / Kim, Jae-Jun (2007): Management of Daily Progress in a Construction Project of Multiple Apartment Buildings. Dans: Journal of Construction Engineering and Management, v. 133, n. 3 (mars 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:3(242)

  30. Lee, Sang-Hyo / Jeon, Rak-Keun / Kim, Ju-Hyung / Kim, Jae-Jun (2011): Strategies for Developing Countries to Expand Their Shares in the Global Construction Market: Phase-Based SWOT and AAA Analyses of Korea. Dans: Journal of Construction Engineering and Management, v. 137, n. 6 (juin 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000316

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine