0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jin, Chengquan / Lee, Yeongchan / Lee, SangHoon / Hyun, Changtaek (2024): Lightweighting Process of Digital Twin Information Models for Smart City Services. Dans: KSCE Journal of Civil Engineering, v. 28, n. 4 (janvier 2024).

    https://doi.org/10.1007/s12205-024-2354-z

  2. Kang, Youngcheol / Jin, Zhengxun / Hyun, Changtaek / Park, Hyeon (2018): Construction Management Functions for Developing Countries: Case of Cambodia. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000609

  3. Moon, HyunSeok / Hyun, Changtaek / Hong, Taehoon (2014): Prediction Model of CO2 Emission for Residential Buildings in South Korea. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000228

  4. Moon, HyunSeok / Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Selection Model for Delivery Methods for Multifamily-Housing Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 2 (avril 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000038

  5. Ji, Changyoon / Hong, Taehoon / Hyun, Changtaek (2010): CBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 4 (octobre 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000018

  6. Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2010): Integrated Schedule and Cost Model for Repetitive Construction Process. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 2 (avril 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000009

  7. Cho, Kyuman / Hyun, Changtaek / Koo, KyoJin / Hong, Taehoon (2010): Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 1 (janvier 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(19)

  8. Yoon, Yousang / Jung, Jinho / Hyun, Changtaek (2016): Decision-making Support Systems Using Case-based Reasoning for Construction Project Delivery Method Selection: Focused on the Road Construction Projects in Korea. Dans: The Open Civil Engineering Journal, v. 10, n. 1 (décembre 2016).

    https://doi.org/10.2174/1874149501610010500

  9. An, Soobae / Ji, Soungmin / Hyun, Changtaek / Han, Sangwon (2015): A model-based productivity improvement of reinforced concrete work in a multi-housing project. Dans: KSCE Journal of Civil Engineering, v. 19, n. 5 (février 2015).

    https://doi.org/10.1007/s12205-015-0302-7

  10. Hyun, Changtaek / Cho, Kyuman / Koo, KyoJin / Hong, Taehoon / Moon, HyunSeok (2008): Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 7 (juillet 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:7(468)

  11. Hong, Taehoon / Cho, Kyuman / Hyun, Changtaek / Han, Seungwoo (2011): Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. Dans: Journal of Construction Engineering and Management, v. 137, n. 6 (juin 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000300

  12. Lee, Seunghoon / Hyun, Changtaek / Hong, Taehoon (2009): RETRIEVE: REmembering Tool for Reusing the Ideas Evolved in Value Engineering. Dans: Automation in Construction, v. 18, n. 8 (décembre 2009).

    https://doi.org/10.1016/j.autcon.2009.07.004

  13. Jin, RunZhi / Han, Sangwon / Hyun, Changtaek / Cha, Yongwoon (2016): Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001072

  14. Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Scheduling model for repetitive construction processes for high-rise buildings. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 1 (janvier 2011).

    https://doi.org/10.1139/l10-108

  15. Koo, ChoongWan / Hong, Taehoon / Hyun, Changtaek / Koo, KyoJin (2010): A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 5 (mai 2010).

    https://doi.org/10.1139/l10-007

  16. Kim, Jonghyeob / Han, Sangwon / Hyun, Changtaek (2016): Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (juin 2016).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000775

  17. Jin, RunZhi / Han, Sangwon / Hyun, Changtaek / Kim, JiHoon (2014): Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. Dans: Journal of Construction Engineering and Management, v. 140, n. 7 (juillet 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000863

  18. Hyun, Changtaek / Jin, Chengquan / Shen, Zhenhua / Kim, Hyunjoo (2018): Automated optimization of formwork design through spatial analysis in building information modeling. Dans: Automation in Construction, v. 95 (novembre 2018).

    https://doi.org/10.1016/j.autcon.2018.07.023

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine