0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Gong, J. W. / Li, Y. P. / Huang, G. H. / Li, Y. F. (2022): Interval-parameter bi-level programming for energy system management under uncertainty: Towards a deep-decarbonized and sustainable future in China. Dans: Sustainable Cities and Society, v. 87 (décembre 2022).

    https://doi.org/10.1016/j.scs.2022.104258

  2. Wang, Z.-Y. / Huang, G. H. / Wang, G. Q. / Gao, J. (2004): Modeling of Vegetation-Erosion Dynamics in Watershed Systems. Dans: Journal of Environmental Engineering (ASCE), v. 130, n. 7 (juillet 2004).

    https://doi.org/10.1061/(asce)0733-9372(2004)130:7(792)

  3. Chen, Z. / Huang, G. H. (2003): Integrated Subsurface Modeling and Risk Assessment of Petroleum-Contaminated Sites in Western Canada. Dans: Journal of Environmental Engineering (ASCE), v. 129, n. 9 (septembre 2003).

    https://doi.org/10.1061/(asce)0733-9372(2003)129:9(858)

  4. Chen, Z. / Huang, G. H. / Chakma, A. (2003): Hybrid Fuzzy-Stochastic Modeling Approach for Assessing Environmental Risks at Contaminated Groundwater Systems. Dans: Journal of Environmental Engineering (ASCE), v. 129, n. 1 (janvier 2003).

    https://doi.org/10.1061/(asce)0733-9372(2003)129:1(79)

  5. Li, Y. P. / Huang, G. H. (2011): Integrated Modeling for Optimal Municipal Solid Waste Management Strategies under Uncertainty. Dans: Journal of Environmental Engineering (ASCE), v. 137, n. 9 (septembre 2011).

    https://doi.org/10.1061/(asce)ee.1943-7870.0000393

  6. Du, P. / Li, Y. P. / Huang, G. H. (2013): Inexact Chance-Constrained Waste-Load Allocation Model for Water Quality Management of Xiangxihe River. Dans: Journal of Environmental Engineering (ASCE), v. 139, n. 9 (septembre 2013).

    https://doi.org/10.1061/(asce)ee.1943-7870.0000724

  7. Zhai, Y. Y. / Huang, G. H. / Zhou, Y. / Zhou, X. (2016): A Factorial Dual-Interval Programming Approach for Planning Municipal Waste Management Systems. Dans: Journal of Environmental Engineering (ASCE), v. 142, n. 8 (août 2016).

    https://doi.org/10.1061/(asce)ee.1943-7870.0001102

  8. Lin, Q. G. / Huang, G. H. / Huang, Y. F. / Zhang, X. D. (2010): Inexact Community-Scale Energy Systems Planning Model. Dans: Journal of Urban Planning and Development, v. 136, n. 3 (septembre 2010).

    https://doi.org/10.1061/(asce)up.1943-5444.0000017

  9. Zhang, L. Z. / He, L. / Huang, G. H. / Zhu, Y. (2013): Integrated Regional Renewable and Nonrenewable Energy Policies Identified through Interval Stochastic Semi-Infinite Programming. Dans: Journal of Energy Engineering, v. 139, n. 2 (juin 2013).

    https://doi.org/10.1061/(asce)ey.1943-7897.0000099

  10. Wang, X. / Yang, Z. F. / Huang, G. H. (2005): High-Order Compact Difference Scheme for Convection–Diffusion Problems on Nonuniform Grids. Dans: Journal of Engineering Mechanics (ASCE), v. 131, n. 12 (décembre 2005).

    https://doi.org/10.1061/(asce)0733-9399(2005)131:12(1221)

  11. Li, Y. P. / Huang, G. H. (2010): Dual-Interval Fuzzy Stochastic Programming Method for Long-Term Planning of Municipal Solid Waste Management. Dans: Journal of Computing in Civil Engineering, v. 24, n. 2 (mars 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000025

  12. Fan, Y. R. / Huang, G. H. / Jin, L. / Suo, M. Q. (2014): Solid waste management under uncertainty: a generalized fuzzy linear programming approach. Dans: Civil Engineering and Environmental Systems, v. 31, n. 4 (août 2014).

    https://doi.org/10.1080/10286608.2014.913031

  13. Xu, Y. / Huang, G. H. / Shao, L. G. (2014): A solid waste management model with fuzzy random parameters. Dans: Civil Engineering and Environmental Systems, v. 31, n. 1 (janvier 2014).

    https://doi.org/10.1080/10286608.2013.853744

  14. Huang, Y. / Huang, G. H. / Hu, Q. (2012): A fuzzy-parameterised stochastic modelling system for predicting multiphase subsurface transport under dual uncertainties. Dans: Civil Engineering and Environmental Systems, v. 29, n. 2 (juin 2012).

    https://doi.org/10.1080/10286608.2012.663355

  15. Li, Y. P. / Huang, G. H. / Zhang, N. / Mo, D. W. / Nie, S. L. (2010): ISIP: capacity planning for flood management systems under uncertainty. Dans: Civil Engineering and Environmental Systems, v. 27, n. 1 (mars 2010).

    https://doi.org/10.1080/10286600802284373

  16. Huang, G. H. / Qin, X. S. / Sun, W. / Nie, X. H. / Li, Y. P. (2009): An optimisation-based environmental decision support system for sustainable development in a rural area in China. Dans: Civil Engineering and Environmental Systems, v. 26, n. 1 (mars 2009).

    https://doi.org/10.1080/10286600802003732

  17. Li, Y. P. / Huang, G. H. / Liu, Y. Y. / Zhang, Y. M. / Nie, S. L. (2008): An inexact stochastic quadratic programming method for municipal solid waste management. Dans: Civil Engineering and Environmental Systems, v. 25, n. 2 (juin 2008).

    https://doi.org/10.1080/10286600801908949

  18. Huang, G. H. / Qin, X. S. (2008): Environmental systems analysis under uncertainty. Dans: Civil Engineering and Environmental Systems, v. 25, n. 2 (juin 2008).

    https://doi.org/10.1080/10485250801908868

  19. Nie, X. H. / Huang, G. H. / Wang, D. / Li, H. L. (2008): Robust optimisation for inexact water quality management under uncertainty. Dans: Civil Engineering and Environmental Systems, v. 25, n. 2 (juin 2008).

    https://doi.org/10.1080/10286600801908964

  20. Li, Y. P. / Huang, G. H. / Nie, S. L. / Huang, Y. F. (2006): IFTSIP: interval fuzzy two-stage stochastic mixed-integer linear programming: a case study for environmental management and planning. Dans: Civil Engineering and Environmental Systems, v. 23, n. 2 (juin 2006).

    https://doi.org/10.1080/10286600600679477

  21. Maqsood, I. / Huang, G. H. / Zeng, G. M. (2004): An inexact two-stage mixed integer linear programming model for waste management under uncertainty. Dans: Civil Engineering and Environmental Systems, v. 21, n. 3 (septembre 2004).

    https://doi.org/10.1080/10286600410001730698

  22. Huang, G. H. / Loucks, D. P. (2000): An Inexact Two-stage Stochastic Programming Model for Water Resources Management Under Uncertainty. Dans: Civil Engineering and Environmental Systems, v. 17, n. 2 (mai 2000).

    https://doi.org/10.1080/02630250008970277

  23. Li, Y. P. / Huang, G. H. (2009): Interval-parameter robust optimization for environmental management under uncertainty. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 4 (avril 2009).

    https://doi.org/10.1139/l08-131

  24. He, L. / Huang, G. H. (2008): Optimization of regional waste management systems based on inexact semi-infinite programming. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 9 (septembre 2008).

    https://doi.org/10.1139/l08-037

  25. Li, Y. P. / Huang, G. H. / Yang, Z. F. / Nie, S. L. (2009): 0-1 Piecewise linearization approach for interval-parameter nonlinear programming:  application to environmental management under uncertainty. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 6 (juin 2009).

    https://doi.org/10.1139/l09-038

  26. Huang, G. H. / Baetz, B. W. / Patry, G. G. (1996): A grey hop, skip, and jump approach: generating alternatives for expansion planning of waste management facilities. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 23, n. 6 (décembre 1996).

    https://doi.org/10.1139/l96-930

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine