0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ngov, Kheang / Ko, Yongho / Noh, Jaeyun / Lee, Sumin / Han, Seungwoo: Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming. Dans: Journal of Asian Architecture and Building Engineering.

    https://doi.org/10.1080/13467581.2024.2320321

  2. Kim, Hyun-Mi / Kim, Tae-Hyung / Shin, Young-Keun / Kim, Young-Suk / Han, Seungwoo (2012): Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 6 (décembre 2012).

    https://doi.org/10.5345/jkibc.2012.12.6.636

  3. Ko, Yongho / Kim, Yujin / Noh, Jaeyun / Lee, Kanghyeok / Shin, Dohyoung / Han, Seungwoo (2023): Methodology for construction-standard-production-rate-based simulation modeling and production-rate data generation. Dans: Journal of Asian Architecture and Building Engineering, v. 23, n. 2 (décembre 2023).

    https://doi.org/10.1080/13467581.2023.2278885

  4. Kim, Sungchul / Kong, Minjin / Choi, Jinwoo / Han, Seungwoo / Baek, Hoyoung / Hong, Taehoon (2021): Feasibility Analysis of COVID-19 Response Guidelines at Construction Sites in South Korea Using CYCLONE in Terms of Cost and Time. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 5 (septembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000957

  5. Kim, Gwangho / Hong, Taehoon / Han, Seungwoo / Lee, Sangyoub (2011): Analysis of Development Cost Based on Planning Characteristics of Multifamily Housing Development Projects. Dans: Journal of Urban Planning and Development, v. 137, n. 3 (septembre 2011).

    https://doi.org/10.1061/(asce)up.1943-5444.0000061

  6. Ji, Changyoon / Hong, Taehoon / Jeong, Kwangbok / Kim, Jimin / Koo, ChoongWan / Lee, Minhyun / Han, Seungwoo / Kang, Youngcheol (2020): Embodied and Operational CO2 Emissions of the Elementary School Buildings in Different Climate Zones. Dans: KSCE Journal of Civil Engineering, v. 24, n. 4 (mars 2020).

    https://doi.org/10.1007/s12205-020-2321-2

  7. Han, Seungwoo / Ko, Yongho / Kim, Jimin / Hong, Taehoon (2018): Housing Market Trend Forecasts through Statistical Comparisons based on Big Data Analytic Methods. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000583

  8. Han, Seungwoo / Ko, Yong-Ho / Hong, Taehoon / Koo, ChoongWan / Lee, Sangyoub (2017): Framework for the validation of simulation-based productivity analysis: focused on curtain wall construction process. Dans: Journal of Civil Engineering and Management, v. 23, n. 2 (février 2017).

    https://doi.org/10.3846/13923730.2014.992468

  9. Han, Seungwoo / Hong, Taehoon / Kim, Gwangho / Lee, Sangyoub (2011): Technical Comparisons of Simulation-Based Productivity Prediction Methodologies By Means of Estimation Tools Focusing on Conventional Earthmovings/ Imitacinių produktyvumo prognozavimo metodikųtechninis palyginimas, pasitelkus vertinimo priemones, akcent. Dans: Journal of Civil Engineering and Management, v. 17, n. 2 (juillet 2011).

    https://doi.org/10.3846/13923730.2011.574381

  10. Ko, Yongho / Han, Seungwoo (2015): Development of Construction Performance Monitoring Methodology using the Bayesian Probabilistic Approach. Dans: Journal of Asian Architecture and Building Engineering, v. 14, n. 1 (janvier 2015).

    https://doi.org/10.3130/jaabe.14.73

  11. Han, Seungwoo / Lee, Taehee / Ko, Yongho (2014): Implementation of Construction Performance Database Prototype for Curtain Wall Operation in High-Rise Building Construction. Dans: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (janvier 2014).

    https://doi.org/10.3130/jaabe.13.149

  12. Lee, Kyung-Suk / Kim, Hyun-Mi / Lee, Tae-Hee / Han, Seungwoo (2012): A Selection Methodology of Slab-form Construction Methods in Residential Buildings based on the Simulation and Delphi Techniques. Dans: Journal of Asian Architecture and Building Engineering, v. 11, n. 1 (mai 2012).

    https://doi.org/10.3130/jaabe.11.39

  13. Han, Seungwoo (2010): Productivity Analysis Comparison of Different Types of Earthmoving Operations by Means of Various Productivity Measurements. Dans: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (mai 2010).

    https://doi.org/10.3130/jaabe.9.185

  14. Han, Seungwoo / Lee, Seunghyun (2008): Quantified Comparison and Analysis of Different Productivity Measurements. Dans: Journal of Asian Architecture and Building Engineering, v. 7, n. 2 (novembre 2008).

    https://doi.org/10.3130/jaabe.7.309

  15. Han, Seungwoo / Kim, Youngsuk / Jeong, Seunghoon / Choi, Jongsoo / Woo, Sungkwon (2014): Simulation technique-based sensitivity analysis on staircase construction process in high-rise building construction. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014).

    https://doi.org/10.1007/s12205-014-0383-8

  16. Han, Seungwoo / Ko, Yongho / Kim, Seongdo / Shin, Do Hyoung (2016): Home sales index prediction model based on cluster and principal component statistical approaches in a big data analytic concept. Dans: KSCE Journal of Civil Engineering, v. 21, n. 1 (mai 2016).

    https://doi.org/10.1007/s12205-016-0574-6

  17. Han, Seungwoo / Ko, Yongho / Kim, Jung-Yeol / Shin, Do Hyoung (2017): Enhancement of Prediction Accuracy for Home Sales Index Prediction Model based on Integration of Multiple Regression Analysis and Genetic Algorithm. Dans: KSCE Journal of Civil Engineering, v. 22, n. 7 (août 2017).

    https://doi.org/10.1007/s12205-017-1648-9

  18. Hong, Taehoon / Cho, Kyuman / Hyun, Changtaek / Han, Seungwoo (2011): Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. Dans: Journal of Construction Engineering and Management, v. 137, n. 6 (juin 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000300

  19. Hong, Taehoon / Han, Seungwoo / Lee, Sangyoub (2007): Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. Dans: Automation in Construction, v. 16, n. 2 (mars 2007).

    https://doi.org/10.1016/j.autcon.2006.01.001

  20. Han, Seungwoo / Lee, Sangyoub / Hong, Taehoon / Chang, Hoon (2006): Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 9 (septembre 2006).

    https://doi.org/10.1139/l05-124

  21. Kim, Jungwuk / Lee, Sangyoub / Hong, Taehoon / Han, Seungwoo (2006): Activity vulnerability index for delay risk forecasting. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 10 (octobre 2006).

    https://doi.org/10.1139/l06-075

  22. Han, Seungwoo / Hong, Taehoon / Lee, Sangyoub (2008): Production prediction of conventional and global positioning system–based earthmoving systems using simulation and multiple regression analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 6 (juin 2008).

    https://doi.org/10.1139/l08-005

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine