0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Liang, Ru / Li, Rui / Chong, Heap-Yih (2023): Sustainable supplier selection for prefabricated megaprojects during COVID-19: a novel large group decision-making model. Dans: Building Research & Information, v. 51, n. 5 (mars 2023).

    https://doi.org/10.1080/09613218.2023.2165474

  2. Chong, Heap-Yih / Cheng, Mengyuan (2023): Smart Contract Implementation in Building Information Modeling–Enabled Projects: Approach to Contract Administration. Dans: Journal of Construction Engineering and Management, v. 149, n. 5 (mai 2023).

    https://doi.org/10.1061/jcemd4.coeng-13216

  3. Liu, Mei / Chong, Heap-Yih / Liao, Pin-chao / Ganbat, Tsenguun (2021): Risk-Based Metanetwork Modeling for Sustainable Project Performance in International Construction. Dans: Journal of Infrastructure Systems, v. 27, n. 3 (septembre 2021).

    https://doi.org/10.1061/(asce)is.1943-555x.0000617

  4. O'Grady, Timothy / Chong, Heap-Yih / Morrison, Gregory M. (2021): A systematic review and meta-analysis of building automation systems. Dans: Building and Environment, v. 195 (mai 2021).

    https://doi.org/10.1016/j.buildenv.2021.107770

  5. Wang, Xiangyu / Chong, Heap-Yih / Kwak, Young Hoon (2017): Supply Chain Management in Megaprojects. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000516

  6. Wang, Xiangyu / Chong, Heap-Yih (2015): Setting new trends of integrated Building Information Modelling (BIM) for construction industry. Dans: Construction Innovation, v. 15, n. 1 (janvier 2015).

    https://doi.org/10.1108/ci-10-2014-0049

  7. Sun, Xinlu / Chong, Heap-Yih / Liao, Pin-chao / Fang, Dongping / Wang, Yanqing (2019): A System Dynamics Model of Prevention through Design towards Eliminating Human Error. Dans: KSCE Journal of Civil Engineering, v. 23, n. 5 (mars 2019).

    https://doi.org/10.1007/s12205-019-0845-0

  8. Hu, Xin / Chong, Heap-Yih / Wang, Xiangyu / London, Kerry (2019): Understanding Stakeholders in Off-Site Manufacturing: A Literature Review. Dans: Journal of Construction Engineering and Management, v. 145, n. 8 (août 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001674

  9. Lopez, Robert / Chong, Heap-Yih / Wang, Xiangyu / Graham, Jeff (2016): Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 5 (mai 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001094

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine