0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Carlos H. Caldas

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Shan, Yongwei / Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2016): Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000375

  2. Caldas, Carlos H. / Soibelman, Lucio / Gasser, Les (2005): Methodology for the Integration of Project Documents in Model-Based Information Systems. Dans: Journal of Computing in Civil Engineering, v. 19, n. 1 (janvier 2005).

    https://doi.org/10.1061/(asce)0887-3801(2005)19:1(25)

  3. Torrent, David Grau / Caldas, Carlos H. (2009): Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects. Dans: Journal of Computing in Civil Engineering, v. 23, n. 1 (janvier 2009).

    https://doi.org/10.1061/(asce)0887-3801(2009)23:1(3)

  4. Suk, Sung Joon / Chi, Seokho / Mulva, Stephen P. / Caldas, Carlos H. / An, Sung-Hoon (2016): Quantifying combination effects of project management practices on cost performance. Dans: KSCE Journal of Civil Engineering, v. 21, n. 3 (mai 2016).

    https://doi.org/10.1007/s12205-016-0499-0

  5. Suk, Sung-Joon / Hwang, Bon-gang / Dai, Jiukun / Caldas, Carlos H. / Mulva, Stephen P. (2012): Performance Dashboard for a Pharmaceutical Project Benchmarking Program. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000503

  6. Caldas, Carlos H. / Kim, Jung-Yeol / Haas, Carl T. / Goodrum, Paul M. / Zhang, Di (2015): Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 141, n. 1 (janvier 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000919

  7. Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2009): Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 135, n. 8 (août 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000024

  8. Teizer, Jochen / Caldas, Carlos H. / Haas, Carl T. (2007): Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources. Dans: Journal of Construction Engineering and Management, v. 133, n. 11 (novembre 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:11(880)

  9. Liu, Jiali / Shahi, Arash / Haas, Carl T. / Goodrum, Paul / Caldas, Carlos H. (2014): Validation Methodologies and Their Impact in Construction Productivity Research. Dans: Journal of Construction Engineering and Management, v. 140, n. 10 (octobre 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000882

  10. Chi, Seokho / Caldas, Carlos H. / Kim, Dae Young (2009): A Methodology for Object Identification and Tracking in Construction Based on Spatial Modeling and Image Matching Techniques. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (avril 2009).

    https://doi.org/10.1111/j.1467-8667.2008.00580.x

  11. Gong, Jie / Caldas, Carlos H. (2011): An object recognition, tracking, and contextual reasoning-based video interpretation method for rapid productivity analysis of construction operations. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011).

    https://doi.org/10.1016/j.autcon.2011.05.005

  12. Caldas, Carlos H. / Torrent, David Grau / Haas, Carl T. (2006): Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 7 (juillet 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:7(741)

  13. Song, Jongchul / Haas, Carl T. / Caldas, Carlos H. (2006): Tracking the Location of Materials on Construction Job Sites. Dans: Journal of Construction Engineering and Management, v. 132, n. 9 (septembre 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:9(911)

  14. Caldas, Carlos H. / Chou, Chien‐Cheng / O'Connor, Jim (2008): Negotiation‐based decision support model for utility relocations in transportation infrastructure projects. Dans: Construction Management and Economics, v. 26, n. 10 (octobre 2008).

    https://doi.org/10.1080/01446190802331388

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine