0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

River-Diversion Intake Structures for the Mohale Dam, Lesotho

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 2, v. 10
Page(s): 85-86
DOI: 10.2749/101686600780557884
Abstrait:

The design of Mohale Dam, a 145-m-high concrete-faced rockfill dam, commenced in January 1996, and the construction contract was awarded in March 1998. Construction began in June 1998, and initial work focused on the construction of two river-diversion tunnels and their associated structures, including the intake structures that are the subject of this article.

Ouvrages et projets

Lieux géographiques

  • Informations
    sur cette fiche
  • Reference-ID
    10000833
  • Publié(e) le:
    17.08.2001
  • Modifié(e) le:
    13.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine