Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System
Auteur(s): |
Bruno Falcón Silveira
Dayana Bastos Costa |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Innovation |
DOI: | 10.1108/ci-02-2022-0030 |
- Informations
sur cette fiche - Reference-ID
10712861 - Publié(e) le:
21.03.2023 - Modifié(e) le:
21.03.2023