Effects of Change Orders on the Cost and Schedule of Rural Road Maintenance Projects

Auteur(s): ORCID (Associate Professor, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154 (corresponding author))
(Project Engineer, Gunda Corporation, Houston, TX 77036; formerly, Graduate Assistant, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.)
(Network Administrator, Kenya Rural Road Authority, Blue Shield Towers, Hospital Rd., Upper Hills, P.O. Box 48151-00100, Nairobi, Kenya.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 9
Page(s): 04517010
DOI: 10.1061/(asce)la.1943-4170.0000227
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000227.
  • Informations
    sur cette fiche
  • Reference-ID
    10579853
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine