0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

BIM Practical Application - New bugesera international airport (Rwanda)

 BIM Practical Application - New bugesera international airport (Rwanda)
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, publié dans , pp. 290-296
DOI: 10.2749/guimaraes.2019.0290
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.55 MB

The increasing complexity of buildings is expressed through different aspects. Requirements such as complex architectural shapes and highly demanding environmental performance require better and mo...
Lire plus

Détails bibliographiques

Auteur(s): (GEG, Porto, Portugal)
(GEG, Porto, Portugal)
(GEG, Porto, Portugal)
(GEG, Porto, Portugal)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Publié dans:
Page(s): 290-296 Nombre total de pages (du PDF): 7
Page(s): 290-296
Nombre total de pages (du PDF): 7
DOI: 10.2749/guimaraes.2019.0290
Abstrait:

The increasing complexity of buildings is expressed through different aspects. Requirements such as complex architectural shapes and highly demanding environmental performance require better and more sophisticated engineering solutions.

The challenging deadlines and budget control demand optimized and automated solutions that adapt perfectly to each project and to the evolution between design stages. These and other aspects generate a proliferation of information and make the life cycle of the project progressively more complex and difficult to control. In this scenario it is imperative for the design team to make use of the most advanced tools available and adapt the design processes to exceed current expectations and prepare future market demands.

GEG has already fully embraced the BIM methodology, in order to respond to these challenges on the projects it is involved.

This article intends to present a specific project - the New Bugesera International Airport of Kigali in Rwanda - as an example of implementation of these processes. Through this example such aspects as the strategies, the difficulties, the advantages, and the tools used to overcome the different challenges are presented. The possibility of showing on site construction, as this is a fast track design build project that is already under construction, introduces additional difficulties but also increases the interest to present this case.

Mots-clé:
Aéroports BIM