• DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Partager

Suivre

Faire un don

Matthias Schüller

Informations biographiques

Publicité

Bibliographie

  1. Schüller, Matthias (2009): Deh Cho Bridge im Norden Kanadas. Dans: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77.
  2. Schüller, Matthias / Singh, Prabhjeet Raj (2010): Fast mover. Effective use of software has been central to a redesign which took just five months. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 52.
  3. Schüller, Matthias / Singh, Prabhjeet Raj (2010): Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 30-31.
  4. Homsi, Elie / Schüller, Matthias / Singh, Prabhjeet Raj (2009): Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009), pp. 46.
  5. Koehler, Christian / Kulhavy, Tomas / Schüller, Matthias / Singh, Prabhjeet Raj (2009): Golden challenge. Dans: Bridge Design & Engineering, v. 15, n. 56 (3e trimestre 2009), pp. 28, 30-31.
Autres publications...
  • Informations
    sur cette fiche
  • Person-ID
    1003092
  • Création
    04.12.2003
  • Modification
    22.07.2014
<