Ian Firth
Informations biographiques
Nom: | Ian Firth |
---|---|
Nom complet: | Ian P. T. Firth |
Lieu(x) d'activité: |
|
Ouvrages et projets
Participation dans les ouvrages et projets suivants:
concepteur initial
- Pont de Stonecutters - Flint & Neill
Bibliographie
- The Design and Construction of Greenwich Reach Swing Bridge. Présenté pendant: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, 19th IABSE Congress Stockholm, 21-23 September 2016, pp. 2407-2414. (2016):
- Copenhagen Inner Harbour Bridge. Présenté pendant: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, 19th IABSE Congress Stockholm, 21-23 September 2016, pp. 2359-2365. (2016):
- A new bridge for Copenhagen harbour. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- The development of a footbridge design through the UK planning process - the Greenwich Reach Footbridge. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Messina Strait Bridge – Suspension System. Présenté pendant: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures, London, September 2011. :
- Informations
sur cette fiche - Person-ID
1002618 - Création
18.04.2003 - Modification
22.07.2014