Steel Girder Bridge with RC Deck Retrofit from Non-Composite to Composite Behavior

 Steel Girder Bridge with RC Deck Retrofit from Non-Composite to Composite Behavior
Auteur(s): ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 1956-1963
DOI: 10.2749/stockholm.2016.1964
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

In the past, a number of steel girder-reinforced concrete deck bridges on county roads in the United States have been built as non-composite. Most of these bridges currently have load postings limi...
Lire plus

Détails bibliographiques

Auteur(s): (University of Kentucky, Lexington, KY, USA)
(University of Kentucky, Lexington, KY, USA)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 1956-1963 Nombre total de pages (du PDF): 8
Page(s): 1956-1963
Nombre total de pages (du PDF): 8
Année: 2016
DOI: 10.2749/stockholm.2016.1964
Abstrait:

In the past, a number of steel girder-reinforced concrete deck bridges on county roads in the United States have been built as non-composite. Most of these bridges currently have load postings limiting the capacity of bus and truck loads on their roadways. Recent research showed that post installed high strength bolts could be used as shear connectors in rehabilitation work to achieve partial composite design by deploying 30% to 50% of the connectors typically required for a full composite design. This paper presents details on the analysis, design, and field application of post-installed shear connectors on a non-composite concrete deck steel girder bridge in Kentucky. In order to minimize traffic disruption and construction costs, the shear connectors were inserted on the bottom side of the deck through the top flange of the steel girder. While the load rating increased by 132%, field tests conducted before and after installation of the shear connectors showed that the bridge’s live load deflections were reduced by more than 27%.