0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: papier de conférence
Langue(s): anglais
Conférence: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin)
Publié dans:
Année: 2017
DOI: 10.24904/footbridge2017.09388
Abstrait:

This paper tells the story about the reconstruction of the so called “Schlosssteg”, a footbridge with 60 m span, located in Waidhofen an der Ybbs, Austria. The main topic deals with the personal relation to the site and the design approach, including the special construction sequence, the so called “noninvasive construction method”. After a short historical and technical overview the architectural approach to the design task will be disscused. It will be shown that the arcitectural approach is inseperable linked to the engineering task. Especialy the used construction method brought major influences to the final design of the structure. By using the old, allready damaged, footbridge for installing the new one, the old bridge had to fulfill a final loadtest, which not only stressed the structure, but also the engineers nerves. The hollistic design strategy led to a design which harmoniosusly blends with its enviroment an therefore became awarded with the “European Steel Bridge Award 2016”.

License:

Cette oeuvre est soumis au droits d'auteurs. Le(s) détenteur(s) des droits permet(tent) l'utilisation la visualistion et le téléchargement de cette oeuvre. La retransmission ou la publication nécessite la permission des détenteurs des droits.

Ouvrages et projets

Télécharger l'aperçu (fichier PDF)
0.79 MB
  • Informations
    sur cette fiche
  • Reference-ID
    10075281
  • Publié(e) le:
    01.09.2017
  • Modifié(e) le:
    10.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine