0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Monitoring System for a Cable-Stayed Bridge in Plock

 Monitoring System for a Cable-Stayed Bridge in Plock
Auteur(s): , ORCID,
Présenté pendant 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, publié dans , pp. 554-555
DOI: 10.2749/222137908796293785
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.09 MB

Not so long ago, a pretty bridge was completed in Poland, over the Vistula River, near the city of Plock. The bridge is made of steel. It is a cable-stayed bridge with a main span of 375 m. The bri...
Lire plus

Détails bibliographiques

Auteur(s):
ORCID

Médium: papier de conférence
Langue(s): anglais
Conférence: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Publié dans:
Page(s): 554-555 Nombre total de pages (du PDF): 5
Page(s): 554-555
Nombre total de pages (du PDF): 5
Année: 2008
DOI: 10.2749/222137908796293785
Abstrait:

Not so long ago, a pretty bridge was completed in Poland, over the Vistula River, near the city of Plock. The bridge is made of steel. It is a cable-stayed bridge with a main span of 375 m. The bridge is subjected to permanent structural control by what we will call a ‘monitoring system’.

This system monitors the following factors: force in the stays, inclination of the pylons, strains in the structure, wind load. The following gauges were employed: load cells, inclinometers, strain gauges, anemometers. The conclusions were divided into four groups: remarks concerning the operation of the system, remarks on the safety of the bridge, knowledge-building observations on the behavior of cable-stayed structures and data on real environmental effects on bridges. The conclusions drawn after the first two years of data acquisition are reassuring. The behavior of the bridge is not unexpected and the parameters measured are within the foreseen limits.

Mots-clé:
Pont à haubans

Ouvrages et projets

Types d'ouvrages

Lieux géographiques