Construction of Humber Bridge A-Frame rocker bearing replacement

 Construction of Humber Bridge A-Frame rocker bearing replacement
Auteur(s): , , , ,
Présenté pendant IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, publié dans , pp. 1625-1628
DOI: 10.2749/222137815818359023
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.11 MB

Bearings connecting the 1410 m main span deck box to the towers of the Humber were heavily worn. A challenging £4m (US$6.3m) replacement scheme including significant temporary works was implemented...
Lire plus

Détails bibliographiques

Auteur(s): (Ove Arup & Partners Ltd, Leeds, UK)
(Ove Arup & Partners Ltd, Leeds, UK)
(C Spencer Ltd, Hull, UK)
(Humber Bridge Board, Hessle, East Riding of Yorkshire, UK)
(Humber Bridge Board, Hessle, East Riding of Yorkshire, UK)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Publié dans:
Page(s): 1625-1628 Nombre total de pages (du PDF): 4
Page(s): 1625-1628
Nombre total de pages (du PDF): 4
Année: 2015
DOI: 10.2749/222137815818359023
Abstrait:

Bearings connecting the 1410 m main span deck box to the towers of the Humber were heavily worn. A challenging £4m (US$6.3m) replacement scheme including significant temporary works was implemented. All works to this landmark structure took place with the bridge open to traffic.

Mots-clé:
pont suspendu appareils d'appui renforcement

Ouvrages et projets