0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Bridge across Vistula River in Plock (Poland) – Project Realization

 Bridge across Vistula River in Plock (Poland) – Project Realization
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, publié dans , pp. 30-39
DOI: 10.2749/222137809796088927
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

The paper presents the project realization of the Roadway Bridge across Vistula River in Plock (Poland) as it was designed, built and open for traffic in October 2007. The bridge, having width of 2...
Lire plus

Détails bibliographiques

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Publié dans:
Page(s): 30-39 Nombre total de pages (du PDF): 8
Page(s): 30-39
Nombre total de pages (du PDF): 8
Année: 2009
DOI: 10.2749/222137809796088927
Abstrait:

The paper presents the project realization of the Roadway Bridge across Vistula River in Plock (Poland) as it was designed, built and open for traffic in October 2007. The bridge, having width of 27,5 m and total length of 1.200 m, consists of two different parts: main bridge part (length of 615 m) over the Vistula riverbed and access bridge part (length of 585 m) over the inundation. The main bridge structure is steel cable-stayed bridge consisting of: continuous bridge girder with orthotropic deck (main span of 375 m and side spans of 2x60 m each), cable stays in the single plane and two obelisk-type pylons fixed in the deck. The access bridge part consists of two bridge structures with composite deck, having structural system of continuous girder, spanning 5 x 58,5 m each. The bridge, as the part of modern bypass, is well incorporated in the environment - plain terrain on the left bank and hilly landscape on the right bank featuring Plock town.

Mots-clé:
Pont à haubans Structure / charpente en acier