0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin)
Publié dans:
Année: 2017
DOI: 10.24904/footbridge2017.09216
Abstrait:

The Beer Sheva Footbridge is a two-span lenticular truss bridge. The slender design and flexible piers cause several low frequencies in each of the three primary directions. In order to stiffen the bridge and still allow thermal expansion, a friction-based connection was designed which resists human induced vibration loads but slips under the large thermal loads. Stiffening the bridge in this way raised the frequency to 1.72Hz and lowered the participating mass to 24%. 6 TMD devices were designed for the bridge for vertical and horizontal vibrations.

On the eve of the 18th of June, all railway traffic was stopped and during a nightlong operation the southern span was lifted into place and welded to its supports. This span has a mass of 230 tons. The 430 ton northern span was lifted during a second operation and welded to its supports. Throughout the entire construction, the traffic was interrupted for less than 24 hours.

Mots-clé:
acier architecture passerelle treillis
License:

Cette oeuvre est soumis au droits d'auteurs. Le(s) détenteur(s) des droits permet(tent) l'utilisation la visualistion et le téléchargement de cette oeuvre. La retransmission ou la publication nécessite la permission des détenteurs des droits.

Ouvrages et projets

Télécharger l'aperçu (fichier PDF)
0.99 MB
  • Informations
    sur cette fiche
  • Reference-ID
    10075235
  • Publié(e) le:
    01.09.2017
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine