0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Temburong Bridge, Brunei - Design of two cable stayed bridges

Auteur(s):





Médium: article de revue
Langue(s): anglais
Publié dans: Bautechnik, , n. 3, v. 92
Page(s): 220-226
DOI: 10.1002/bate.201500013
Abstrait:

The Temburong Bridge Project is a 30 km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei districts. The main objective of the project is to stimulate economic growth in the Temburong region by connecting it to the country's airport and ports. The alignment crosses two navigation channels resulting in the need for two cable stayed bridges - the Brunei Channel Bridge (145 m main span) and the Eastern Channel Bridge (260 m main span).
The design of these cable stayed bridges is one of the first applications of the Eurocode to a fully concrete cable stayed bridge. Both cable stayed bridges draw on strong Islamic architectural influences from the region to form a tower shape that is unique and instantly recognisable.

Mots-clé:
Pont à haubans Eurocodes
Disponible chez: Voir chez l'éditeur

Ouvrages et projets

Types d'ouvrages

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/bate.201500013.
  • Informations
    sur cette fiche
  • Reference-ID
    10071642
  • Publié(e) le:
    17.03.2015
  • Modifié(e) le:
    27.04.2015
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine