0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Puente arco de ferrocarril sobre el embalse de Contreras en la línea de alta velocidad Madrid-Levante

Auteur(s):



Médium: article de revue
Langue(s): anglais, espagnol
Publié dans: Hormigón y acero, , n. 264, v. 63
Page(s): 5-29
Abstrait:

Railway arch bridge over the Contreras Reservoir in the Madrid-Levante high-speed railway line

The reinforced concrete arch bridge of a 261 m span, with an upper prestressed concrete deck and a total length of 587.25 m, spans the Contreras Reservoir on the Madrid-Levante high-speed railway line. The mid-span sag is 36.944 m thus determining a span-to-rise ratio of over 6.77 to 1, which is a low rising arch although not excessively so. On the construction completion date, the span between the arch supports was holder of the world record for a concrete railway arch bridge. It was built by free cantilever system using a temporary pier that was dismantled once the two semi-arches had been joined. The deck was built span by span with a scaffolding truss on either side of the arch. Jacks at the crown of the bridge were not used since they would not have improved significantly the global forces in the bridge.

Mots-clé:
béton pont en arc
Disponible chez: ACHE - Asociación Española de Ingeniería Estructural

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10075534
  • Publié(e) le:
    03.10.2018
  • Modifié(e) le:
    03.10.2018
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine