• DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Partager

Suivre

Ejecución del dique en la dársena

Auteur(s):

Médium: article de revue
Langue(s): en  es 
Publié dans: Hormigón y acero, , n. 223-226, v. 53
Page(s): 119-137
Abstrait:

Execution of the dock in the Crinavis basin

This section covers all aspects of the construction of the dock, including a study of the main factors affecting the execution of the works at the dry dock in Algeciras Bay: ? The Crinavis Basin. ? Site facilities. ? Provisional foundations. ? Execution stages: Division into eight modules ("Plots"). ? Formwork, reinforcement and concrete-pouring. ? Full scale tests. ? Pre-stressing process: cable and reinforcing bar families. ? Special ball joint area (clamping to the concrete).

Disponible chez: ACHE - Asociación Española de Ingeniería Estructural

Ouvrages et projets

Publicité

  • Informations
    sur cette fiche
  • Reference-ID
    10075841
  • Création
    25.10.2018
  • Modification
    25.10.2018